Monterrey Cement Plant — Mexico
Cement Plant in Mexico. Approximate location 25.70095, -100.29797.
Cement PlantMexicoCO₂ estimate (modelled)
Monterrey Cement Plant is a cement plant in Mexico. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by CEMEX SAB de CV. It emits about 56,915 t CO₂e a year from Climate TRACE. That is 0.14% of the CO₂e from the 62 facilities in Mexico that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438902.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Siam White Khao Wong Cement Plant · 57,474 t CO₂e/yr · Thailand
- Ekbatan White Saravak Cement Plant · 56,216 t CO₂e/yr · Iran
- Cosmos Cement Janakpur Cement Plant · 57,834 t CO₂e/yr · Nepal
- Bsaira Cement Plant · 58,907 t CO₂e/yr · Jordan
- Bishwokarma Mukundapur Cement Plant · 54,903 t CO₂e/yr · Nepal
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- PEGI MONTERREY · Gas · 108 MW · 2 km
- Ternium Monterrey power station · Gas · 50 MW · 2 km
- SAN JERONIMO (CFE) · Other · 138 MW · 7 km
- Planta Norte (Gob. de Nuevo León) · Biomass · 2 MW · 11 km
- GP Energía power station · Gas · 240 MW · 12 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 56,915 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 57k t CO₂e/yr (Scope 1), Monterrey Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 57k t at the EU CBAM rate (€75/t) is €4.3M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by CEMEX SAB de CV. All facilities by this operator →
Local climate
Monterrey Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 25.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1297 W/m² to ambient — roughly 1.00× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Ternium Guerrero San Nicolás de los Garza steel plant · Steel Plant · 1,076,601 t CO₂
- Ternium Apodaca steel plant · Steel Plant · 29,740 t CO₂
- Hidalgo Cement Plant · Cement Plant · 51,809 t CO₂
- Pemex Cadereyta Refinery · Refinery · 2,096,251 t CO₂
- Ramos Arizpe Cement Plant · Cement Plant · 469,009 t CO₂
- DEACERO Ramos Arizpe steel plant · Steel Plant · 136,979 t CO₂
Location
Coordinates 25.70095, -100.29797. View on OpenStreetMap.
Frequently asked questions
What type of facility is Monterrey Cement Plant?
Monterrey Cement Plant is a cement plant in Mexico. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Monterrey Cement Plant emit?
The page uses about 56,915 t CO₂e/year from the open dataset It ranks #54 among facilities in Mexico by estimated CO₂.
Where is Monterrey Cement Plant located?
Monterrey Cement Plant is in Mexico at approximately 25.70095, -100.29797.
Who operates Monterrey Cement Plant?
The operator recorded in the open dataset is CEMEX SAB de CV.