Home / Asia / India / Steel plants / Prakash Industries Janjgir steel plant

Prakash Industries Janjgir steel plant

Steel Plant in India. Approximate location 22.001, 82.66989.

Steel PlantIndiaCO₂ estimate (modelled)

Prakash Industries Janjgir steel plant is a steel plant in India. Its listed capacity is 1,190,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. By capacity it ranks #20 among 49 steel plants in India. It emits about 1,875,246 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 437k passenger cars. Its CO₂ per unit of capacity is 70% above the national median for this sector.

1,190,000t of steel
1,875,246t CO₂e / yr (Climate TRACE)
#74CO₂ rank in India
1.58t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42741422.

Data status

Known source data

FacilityPrakash Industries Janjgir steel plant Climate TRACE
CountryIndia Climate TRACE
Coordinates22.001, 82.66989 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Reported capacity1,190,000 t of steel Climate TRACE
GEM steel parentPrakash Industries Ltd [100%] Global Energy Monitor
Steel process routeintegrated DRI Global Energy Monitor
Steel asset statusoperating Global Energy Monitor
Steel equipmentDRI, other Global Energy Monitor
Steel capacity1,250 ktpa Global Energy Monitor
Modelled CO₂e1,875,246 t/yr Climate TRACE

Calculated from the dataset

India rank#74 of 297 · top 24.9% calculated
Global iron-and-steel rank#325 of 868 · top 37.4% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 1,190,000 t of steel, Prakash Industries Janjgir steel plant is well above the median steel plant in India (770,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 1,875,246 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

437kcars driven for a year
245khomes' annual energy use
31 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 1.9M t CO₂e/yr (Scope 1), Prakash Industries Janjgir steel plant carries no domestic carbon price — and as a CBAM-covered product, its 1.9M t at the EU CBAM rate (€75/t) is €141M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈38k t–94k t/yr, worth €2.8M€7.1M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

1.9M t CO₂e / yrScope 1 emissions
€141M/yrCBAM exposure on EU exports
38k t–94k t/yr ≈ €2.8M€7.1MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest steel plants in India

JSW Steel Vijayanagar steel plant: 11,899,000 t of steel11.9MJSW Steel …Tata Steel Jamshedpur steel plant: 11,000,000 t of steel11.0MTata Steel…JSW Steel Dolvi steel plant: 10,200,000 t of steel10.2MJSW Steel …ArcelorMittal Nippon Steel Hazira Plant: 9,600,000 t of steel9.6MArcelorMit…RINL Vizag Steel plant: 7,302,000 t of steel7.3MRINL Vizag…SAIL Bhilai steel plant: 6,999,000 t of steel7.0MSAIL Bhila…JSPL Angul steel plant: 6,000,000 t of steel6.0MJSPL Angul…Tata Steel Kalinganagar steel plant: 5,513,661 t of steel5.5MTata Steel…

Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Parent company

Prakash Industries Ltd Global Energy Monitor
Parent company per Global Energy Monitor; the operator itself is not stated in the source dataset.

Local climate

Prakash Industries Janjgir steel plant sits in a tropical savanna climate zone (Köppen Aw), at 22.0°N in the northern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
40/100environmental-severity index
15.1°Cseasonal temperature swing
406 kmdistance to coast
ModerateCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1229 W/m² to ambient — roughly 0.94× the loss at a 20 °C reference; removable insulation recovers about 1168 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #20 largest of 49 steel plants in India by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 22.001, 82.66989. View on OpenStreetMap.

Heat loss & insulation profile

For a steel plant, the main modular-insulation targets are reheat & annealing furnaces, ladles, hot-blast stoves, steam & gas ducting. Typical hot-surface ranges used for screening: 200–1,200 °C.

Indicative recoverable energy

A first-pass insulation screen suggests about 4,800 MWh/year of recoverable heat-loss reduction and about 1,600 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Prakash Industries Janjgir steel plant?

Prakash Industries Janjgir steel plant is a steel plant in India. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

What capacity is listed for Prakash Industries Janjgir steel plant?

The open dataset lists 1,190,000 t of steel of capacity for Prakash Industries Janjgir steel plant.

How much CO₂ does Prakash Industries Janjgir steel plant emit?

The page uses about 1,875,246 t CO₂e/year from the open dataset It ranks #74 among facilities in India by estimated CO₂.

Where is Prakash Industries Janjgir steel plant located?

Prakash Industries Janjgir steel plant is in India at approximately 22.001, 82.66989.

Built from open public data; no personal information. Operate this site? Request a correction or removal.