novoroscement Oktyabr Cement Plant — Russian Federation
Cement Plant in Russian Federation. Approximate location 44.72804, 37.82284.
Cement PlantRussian FederationCO₂ estimate (modelled)
novoroscement Oktyabr Cement Plant is a cement plant in Russian Federation. Its listed capacity is 2,210,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Novorostsement OJSC. By capacity it ranks #10 among 27 cement plants in Russian Federation. It emits about 1,087,220 t CO₂e a year from Climate TRACE. That is 0.46% of the CO₂e from the 186 facilities in Russian Federation that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 36% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439080.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Kampot Cement Dang Tong Cement Plant · 1,083,961 t CO₂e/yr · Cambodia
- Tura Cement Plant · 1,082,565 t CO₂e/yr · Egypt
- Pacasamayo Cement Plant · 1,079,719 t CO₂e/yr · Peru
- Ivano-Frankivskcement Cement Plant · 1,097,321 t CO₂e/yr · Ukraine
- Ciplam Sobradinho Cement Plant · 1,077,007 t CO₂e/yr · Brazil
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
At 2,210,000 t of cement, novoroscement Oktyabr Cement Plant is well above the median cement plant in Russian Federation (1,700,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 1,087,220 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 1.1M t CO₂e/yr (Scope 1), novoroscement Oktyabr Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.1M t at the EU CBAM rate (€75/t) is €81.9M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Russian Federation
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Novorostsement OJSC. All facilities by this operator →
Local climate
novoroscement Oktyabr Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 44.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
How it compares & nearby sites
The #10 largest of 27 cement plants in Russian Federation by listed capacity (Climate TRACE).
Nearby industrial sites
- novoroscement Proletary Cement Plant · Cement Plant · 1,098,135 t CO₂
- Atakaycement Cement Plant · Cement Plant · 142,001 t CO₂
- Verkhnebakansky Cement Plant · Cement Plant · 713,638 t CO₂
- novoroscement Pervomaisky Cement Plant · Cement Plant · 807,117 t CO₂
- Abinsk Electric Steel Works · Steel Plant · 217,253 t CO₂
- Slavyansk Refinery · Refinery · 486,786 t CO₂
Location
Coordinates 44.72804, 37.82284. View on OpenStreetMap.
Frequently asked questions
What type of facility is novoroscement Oktyabr Cement Plant?
novoroscement Oktyabr Cement Plant is a cement plant in Russian Federation. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for novoroscement Oktyabr Cement Plant?
The open dataset lists 2,210,000 t of cement of capacity for novoroscement Oktyabr Cement Plant.
How much CO₂ does novoroscement Oktyabr Cement Plant emit?
The page uses about 1,087,220 t CO₂e/year from the open dataset It ranks #54 among facilities in Russian Federation by estimated CO₂.
Where is novoroscement Oktyabr Cement Plant located?
novoroscement Oktyabr Cement Plant is in Russian Federation at approximately 44.72804, 37.82284.
Who operates novoroscement Oktyabr Cement Plant?
The operator recorded in the open dataset is Novorostsement OJSC.
