Home / Russian Federation / Cement plants / Atakaycement Cement Plant

Atakaycement Cement Plant — Russian Federation

Cement Plant in Russian Federation. Approximate location 44.79279, 37.69437.

Cement PlantRussian FederationCO₂ estimate (modelled)

Atakaycement Cement Plant is a cement plant in Russian Federation. Its listed capacity is 450,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Atakaycement LLC. By capacity it ranks #24 among 27 cement plants in Russian Federation. It emits about 142,001 t CO₂e a year from Climate TRACE. That is 0.06% of the CO₂e from the 186 facilities in Russian Federation that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 13% below the national median for this sector.

450,000t of cement
142,001t CO₂e / yr (Climate TRACE)
#155CO₂ rank in Russian Federation
0.32t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897728.

Data status

Known source data

FacilityAtakaycement Cement Plant Climate TRACE
CountryRussian Federation Climate TRACE
Coordinates44.79279, 37.69437 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity450,000 t of cement Climate TRACE
Owner / operatorAtakaycement LLC Climate TRACE
Modelled CO₂e142,001 t/yr Climate TRACE

Calculated from the dataset

Russian Federation rank#155 of 186 · top 83.3% calculated
Global cement rank#1965 of 2113 · top 93.0% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

At 450,000 t of cement, Atakaycement Cement Plant is below the median cement plant in Russian Federation (1,700,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 142,001 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

787railcars of coal burned
30khomes' electricity use for a year
142kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 142k t CO₂e/yr (Scope 1), Atakaycement Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 142k t at the EU CBAM rate (€75/t) is €10.7M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

142k t CO₂e / yrScope 1 emissions
€10.7M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest cement plants in Russian Federation

Mordovtsement Cement Plant: 5,000,000 t of cement5.0MMordovtsem…Sebryakovsky Cement Plant: 4,060,000 t of cement4.1MSebryakovs…Oskolcement Cement Plant: 3,700,000 t of cement3.7MOskolcemen…Topkinsky Cement Plant: 3,700,000 t of cement3.7MTopkinsky …SLK Sukholozhskcement Cement Plant: 3,500,000 t of cement3.5MSLK Sukhol…novoroscement Proletary Cement Plant: 2,600,000 t of cement2.6Mnovoroscem…Ferzikovo Cement Plant: 2,420,000 t of cement2.4MFerzikovo …Maltsovsky Portlandcement Cement Plant: 2,348,000 t of cement2.3MMaltsovsky…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Atakaycement LLC.

Local climate

Atakaycement Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 44.8°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #24 largest of 27 cement plants in Russian Federation by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 44.79279, 37.69437. View on OpenStreetMap.

Frequently asked questions

What type of facility is Atakaycement Cement Plant?

Atakaycement Cement Plant is a cement plant in Russian Federation. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Atakaycement Cement Plant?

The open dataset lists 450,000 t of cement of capacity for Atakaycement Cement Plant.

How much CO₂ does Atakaycement Cement Plant emit?

The page uses about 142,001 t CO₂e/year from the open dataset It ranks #155 among facilities in Russian Federation by estimated CO₂.

Where is Atakaycement Cement Plant located?

Atakaycement Cement Plant is in Russian Federation at approximately 44.79279, 37.69437.

Who operates Atakaycement Cement Plant?

The operator recorded in the open dataset is Atakaycement LLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.