Nordkalk Oy Ab, Ihalaisen Kaivos — Finland
Lime Plant in Finland. Approximate location 61.01585, 28.18324.
Lime PlantFinlandCO₂ estimate (modelled)
Nordkalk Oy Ab, Ihalaisen Kaivos is a lime plant in Finland. Its listed capacity is 108,264 t of lime. Lime plants calcine limestone in kilns at 800–900°C; the quicklime they produce reacts with moisture and has to be kept dry. By capacity it ranks #6 among 6 lime plants in Finland. It emits about 102,352 t CO₂e a year from Climate TRACE. That is 0.85% of the CO₂e from the 28 facilities in Finland that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 44% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38467376.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Unicalce S.P.A. - Stabilimento Di Bernezzo · 103,361 t CO₂e/yr · Italy
- Calmit Hungária Kft. · 100,563 t CO₂e/yr · Hungary
- Závod Mokrá · 104,406 t CO₂e/yr · Czechia
- Xingren County Xinghong Lime Factory. · 106,671 t CO₂e/yr · China
- Carmeuse Hungária Kft. · 107,754 t CO₂e/yr · Hungary
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Lappeenranta Kaukaan tehdas · Biomass · 119 MW · 5 km
- Lappeenranta TG9 · Biomass · 67 MW · 5 km
- Lappeenranta kombi · Gas · 26 MW · 5 km
- Mertaniemi 1 ja 2 · Other · 102 MW · 5 km
- Sunila · Biomass · 36 MW · 7 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 108,264 t of lime, Nordkalk Oy Ab, Ihalaisen Kaivos is below the median lime plant in Finland (166,642 t of lime). Subsector: lime. As lime plant, it requires high process heat (typically 600–900°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Lime plants calcine limestone in kilns at 800–900°C; the quicklime they produce reacts with moisture and has to be kept dry.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 102,352 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 102k t CO₂e/yr (Scope 1), Nordkalk Oy Ab, Ihalaisen Kaivos carries €8.7M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest lime plants in Finland
Listed capacity (t of lime), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Local climate
Nordkalk Oy Ab, Ihalaisen Kaivos sits in a warm-summer humid continental climate zone (Köppen Dfb), at 61.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with thermal cycling the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1461 W/m² to ambient — roughly 1.12× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #6 largest of 6 lime plants in Finland by listed capacity (Climate TRACE).
Nearby industrial sites
- Lappeenranta Cement Plant · Cement Plant · 106,600 t CO₂
- UPM Group - Paper Industry - Kaukas Mill · Pulp & Paper Mill
- Metsä Fibre Oy - Joutseno Mill · Pulp & Paper Mill · 302,260 t CO₂
- Metsä Board Cartonboard Division Joutseno Mill · Pulp & Paper Mill
- Ovako Imatra steel plant · Steel Plant · 49,870 t CO₂
- Pulp Invest LLC - Svetogorsk Mill · Pulp & Paper Mill · 83,766 t CO₂
Location
Coordinates 61.01585, 28.18324. View on OpenStreetMap.
Frequently asked questions
What type of facility is Nordkalk Oy Ab, Ihalaisen Kaivos?
Nordkalk Oy Ab, Ihalaisen Kaivos is a lime plant in Finland. Lime plants calcine limestone in kilns at 800–900°C; the quicklime they produce reacts with moisture and has to be kept dry.
What capacity is listed for Nordkalk Oy Ab, Ihalaisen Kaivos?
The open dataset lists 108,264 t of lime of capacity for Nordkalk Oy Ab, Ihalaisen Kaivos.
How much CO₂ does Nordkalk Oy Ab, Ihalaisen Kaivos emit?
The page uses about 102,352 t CO₂e/year from the open dataset It ranks #24 among facilities in Finland by estimated CO₂.
Where is Nordkalk Oy Ab, Ihalaisen Kaivos located?
Nordkalk Oy Ab, Ihalaisen Kaivos is in Finland at approximately 61.01585, 28.18324.