Závod Mokrá — Czechia
Lime Plant in Czechia. Approximate location 49.21544, 16.77405.
Lime PlantCzechiaCO₂ estimate (modelled)
Závod Mokrá is a lime plant in Czechia. Its listed capacity is 1,141,305 t of lime. Lime plants calcine limestone in kilns at 800–900°C; the quicklime they produce reacts with moisture and has to be kept dry. It emits about 104,406 t CO₂e a year from Climate TRACE. That is 1.1% of the CO₂e from the 16 facilities in Czechia that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 86% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38467374.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Unicalce S.P.A. - Stabilimento Di Bernezzo · 103,361 t CO₂e/yr · Italy
- Nordkalk Oy Ab, Ihalaisen Kaivos · 102,352 t CO₂e/yr · Finland
- Xingren County Xinghong Lime Factory. · 106,671 t CO₂e/yr · China
- Carmeuse Hungária Kft. · 107,754 t CO₂e/yr · Hungary
- Calmit Hungária Kft. · 100,563 t CO₂e/yr · Hungary
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Spalovna Brno power station · Biomass · 23 MW · 8 km
- Křenovice Solar Power Plant · Solar · 2 MW · 9 km
- Brno-Tuřany Solar Power Plant · Solar · 22 MW · 10 km
- Slavkov Solar Power Plant · Solar · 1 MW · 11 km
- Špitálka power station · Gas · 81 MW · 11 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 1,141,305 t of lime, Závod Mokrá is around the median lime plant in Czechia (1,141,305 t of lime). Subsector: lime. As lime plant, it requires high process heat (typically 600–900°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Lime plants calcine limestone in kilns at 800–900°C; the quicklime they produce reacts with moisture and has to be kept dry.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 104,406 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 104k t CO₂e/yr (Scope 1), Závod Mokrá carries €8.9M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Local climate
Závod Mokrá sits in a temperate oceanic climate zone (Köppen Cfb), at 49.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1408 W/m² to ambient — roughly 1.08× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Mokra Cement Plant · Cement Plant · 559,809 t CO₂
- Farma Nevojice · Food & Beverage
- Cukrovar Vrbátky A.S. · Food & Beverage
- Hamé S.R.O. · Food & Beverage
- Moravskoslezské Cukrovary, A.S. Závod Hrušovany · Food & Beverage
- Žerotín, A.S. · Food & Beverage
Location
Coordinates 49.21544, 16.77405. View on OpenStreetMap.
Frequently asked questions
What type of facility is Závod Mokrá?
Závod Mokrá is a lime plant in Czechia. Lime plants calcine limestone in kilns at 800–900°C; the quicklime they produce reacts with moisture and has to be kept dry.
What capacity is listed for Závod Mokrá?
The open dataset lists 1,141,305 t of lime of capacity for Závod Mokrá.
How much CO₂ does Závod Mokrá emit?
The page uses about 104,406 t CO₂e/year from the open dataset It ranks #14 among facilities in Czechia by estimated CO₂.
Where is Závod Mokrá located?
Závod Mokrá is in Czechia at approximately 49.21544, 16.77405.