Hani i Elezit Cement Plant — XKX
Cement Plant in XKX. Approximate location 42.14675, 21.29952.
Cement PlantXKXCO₂ estimate (modelled)
Hani i Elezit Cement Plant is a cement plant in XKX. Its listed capacity is 694,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Sharrcem SHPK. It emits about 385,902 t CO₂e a year from Climate TRACE. Its CO₂ per unit of capacity is 54% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439405.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- La Robla Cement Plant · 387,217 t CO₂e/yr · Spain
- Whitehall Cement Plant · 384,407 t CO₂e/yr · United States
- Thabazimbi Local Municipality Cement Plant · 383,862 t CO₂e/yr · South Africa
- Holcim Garadagh Cement Plant · 388,063 t CO₂e/yr · Azerbaijan
- Belgrano Cement Plant · 382,963 t CO₂e/yr · Argentina
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Skopje CHP power station · Gas · 220 MW · 21 km
- Matka Hydroelectric Power Plant Macedonia · Hydro · 10 MW · 22 km
- Sveta Peka Hydroelectric Power Plant Macedonia · Hydro · 36 MW · 25 km
- Kozjak Hydroelectric Power Plant Macedonia · Hydro · 82 MW · 31 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 694,000 t of cement, Hani i Elezit Cement Plant is around the median cement plant in XKX (694,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 385,902 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 386k t CO₂e/yr (Scope 1), Hani i Elezit Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 386k t at the EU CBAM rate (€75/t) is €29.1M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Sharrcem SHPK.
Local climate
Hani i Elezit Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 42.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1392 W/m² to ambient — roughly 1.07× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Hellenic OKTA Skopje Refinery · Refinery · 190,123 t CO₂
- Makstil Skopje Steel plant · Steel Plant · 24,401 t CO₂
- Usje Cement Plant · Cement Plant · 380,764 t CO₂
- Borizane Cement Plant · Cement Plant · 418,020 t CO₂
- Fushi Kruji Cement Plant · Cement Plant · 475,835 t CO₂
- Kurum International Elbasan steel plant · Steel Plant · 23,718 t CO₂
Location
Coordinates 42.14675, 21.29952. View on OpenStreetMap.
Frequently asked questions
What type of facility is Hani i Elezit Cement Plant?
Hani i Elezit Cement Plant is a cement plant in XKX. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Hani i Elezit Cement Plant?
The open dataset lists 694,000 t of cement of capacity for Hani i Elezit Cement Plant.
How much CO₂ does Hani i Elezit Cement Plant emit?
The page uses about 385,902 t CO₂e/year from the open dataset It ranks #1 among facilities in XKX by estimated CO₂.
Where is Hani i Elezit Cement Plant located?
Hani i Elezit Cement Plant is in XKX at approximately 42.14675, 21.29952.
Who operates Hani i Elezit Cement Plant?
The operator recorded in the open dataset is Sharrcem SHPK.
