Borizane Cement Plant — Albania
Cement Plant in Albania. Approximate location 41.54885, 19.72631.
Cement PlantAlbaniaCO₂ estimate (modelled)
Borizane Cement Plant is a cement plant in Albania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by ANTEA Cement ShA. It emits about 418,020 t CO₂e a year from Climate TRACE. That is 43% of the CO₂e from the 5 facilities in Albania that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437200.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Tsobis Cement Plant · 417,758 t CO₂e/yr · Namibia
- Delportshoop Cement Plant · 417,187 t CO₂e/yr · South Africa
- CSN Cimentos Brasil Cantagalo Plant · 417,073 t CO₂e/yr · Brazil
- Vicem Hoang Mai Cement Thị xã Hoàng Mai Cement Plant · 419,246 t CO₂e/yr · Vietnam
- DIC Huu Nghi Cement Plant · 416,194 t CO₂e/yr · Vietnam
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Shkopet · Hydro · 24 MW · 17 km
- Ulez · Hydro · 25 MW · 20 km
- Lanabregas · Hydro · 5 MW · 27 km
- Porto Romano Power Station · Coal · 800 MW · 32 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 418,020 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 418k t CO₂e/yr (Scope 1), Borizane Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 418k t at the EU CBAM rate (€75/t) is €31.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by ANTEA Cement ShA.
Local climate
Borizane Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 41.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1385 W/m² to ambient — roughly 1.06× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Fushi Kruji Cement Plant · Cement Plant · 475,835 t CO₂
- Bitex Refinery · Refinery · 15,593 t CO₂
- Kurum International Elbasan steel plant · Steel Plant · 23,718 t CO₂
- ARMO Fier Bitumen Refinery · Refinery · 38,984 t CO₂
- Podgorica aluminium plant · Aluminium Smelter · 170,152 t CO₂
- Armo Ballsh Refinery · Refinery
Location
Coordinates 41.54885, 19.72631. View on OpenStreetMap.
Frequently asked questions
What type of facility is Borizane Cement Plant?
Borizane Cement Plant is a cement plant in Albania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Borizane Cement Plant emit?
The page uses about 418,020 t CO₂e/year from the open dataset It ranks #2 among facilities in Albania by estimated CO₂.
Where is Borizane Cement Plant located?
Borizane Cement Plant is in Albania at approximately 41.54885, 19.72631.
Who operates Borizane Cement Plant?
The operator recorded in the open dataset is ANTEA Cement ShA.
