Grupo Simec Apizaco Cholula steel plant — Mexico
Steel Plant in Mexico. Approximate location 19.39674, -98.08818.
Steel PlantMexicoCO₂ estimate (modelled)
Grupo Simec Apizaco Cholula steel plant is a steel plant in Mexico. Its listed capacity is 1,140,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Aceros Especiales Simec Tlaxcala SA de CV. By capacity it ranks #8 among 10 steel plants in Mexico. It emits about 56,507 t CO₂e a year from Climate TRACE. That is 0.14% of the CO₂e from the 62 facilities in Mexico that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 95% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566981.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Vallourec Star Youngstown steel plant · 56,637 t CO₂e/yr · United States
- Shijiazhuang Iron and Steel Co Ltd Special Steel Branch · 56,986 t CO₂e/yr · China
- Topy Industries Toyohashi steel plant · 55,519 t CO₂e/yr · Japan
- Acciaierie Venete Sarezzo steel plant · 57,954 t CO₂e/yr · Italy
- Danieli ABS Pozzuolo del Friuli steel plant · 54,909 t CO₂e/yr · Italy
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- San Lorenzo Potencia · Gas · 382 MW · 35 km
- Complejo Petroquímico Independencia power station · Gas · 54 MW · 38 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 1,140,000 t of steel, Grupo Simec Apizaco Cholula steel plant is below the median steel plant in Mexico (1,650,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 56,507 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 57k t CO₂e/yr (Scope 1), Grupo Simec Apizaco Cholula steel plant carries no domestic carbon price — and as a CBAM-covered product, its 57k t at the EU CBAM rate (€75/t) is €4.3M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest steel plants in Mexico
Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Aceros Especiales Simec Tlaxcala SA de CV. All facilities by this operator →
Local climate
Grupo Simec Apizaco Cholula steel plant sits in a subtropical highland climate zone (Köppen Cwb), at 19.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1353 W/m² to ambient — roughly 1.04× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #8 largest of 10 steel plants in Mexico by listed capacity (Climate TRACE).
Nearby industrial sites
- Ternium Puebla steel plant · Steel Plant · 596,616 t CO₂
- San Martin Texmelucan Independencia Methanol · Chemical Plant · 56,070 t CO₂
- Tepeaca Cement Plant · Cement Plant · 2,772,979 t CO₂
- Gerdau Corsa Ciudad Sahagún steel plant · Steel Plant · 49,567 t CO₂
- Puebla Cement Plant · Cement Plant · 474,769 t CO₂
- Kimberly-Clark de México S.A. de C.V. - Ectapec Mill · Pulp & Paper Mill
Location
Coordinates 19.39674, -98.08818. View on OpenStreetMap.
Frequently asked questions
What type of facility is Grupo Simec Apizaco Cholula steel plant?
Grupo Simec Apizaco Cholula steel plant is a steel plant in Mexico. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for Grupo Simec Apizaco Cholula steel plant?
The open dataset lists 1,140,000 t of steel of capacity for Grupo Simec Apizaco Cholula steel plant.
How much CO₂ does Grupo Simec Apizaco Cholula steel plant emit?
The page uses about 56,507 t CO₂e/year from the open dataset It ranks #55 among facilities in Mexico by estimated CO₂.
Where is Grupo Simec Apizaco Cholula steel plant located?
Grupo Simec Apizaco Cholula steel plant is in Mexico at approximately 19.39674, -98.08818.
Who operates Grupo Simec Apizaco Cholula steel plant?
The operator recorded in the open dataset is Aceros Especiales Simec Tlaxcala SA de CV.