Altıeylül Cement Plant is a cement plant in Türkiye. Its listed capacity is 2,323,750 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Limak Cimento Sanayi ve Ticaret AŞ. By capacity it ranks #16 among 30 cement plants in Türkiye. It emits about 481,286 t CO₂e a year from Climate TRACE. That is 0.59% of the CO₂e from the 94 facilities in Türkiye that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 43% below the national median for this sector.

2,323,750t of cement
481,286t CO₂e / yr (Climate TRACE)
#54CO₂ rank in Türkiye
0.21t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439195.

Data status

Known source data

FacilityAltıeylül Cement Plant Climate TRACE
CountryTürkiye Climate TRACE
Coordinates39.60774, 27.87893 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity2,323,750 t of cement Climate TRACE
Owner / operatorLimak Cimento Sanayi ve Ticaret AŞ Climate TRACE
Modelled CO₂e481,286 t/yr Climate TRACE

Calculated from the dataset

Türkiye rank#54 of 94 · top 57.4% calculated
Global cement rank#1202 of 2113 · top 56.9% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 2,323,750 t of cement, Altıeylül Cement Plant is around the median cement plant in Türkiye (2,480,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 481,286 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

2.7krailcars of coal burned
112kgasoline cars driven for a year
481kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 481k t CO₂e/yr (Scope 1), Altıeylül Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 481k t at the EU CBAM rate (€75/t) is €36.3M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

481k t CO₂e / yrScope 1 emissions
€36.3M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest cement plants in Türkiye

Silifke Cement Plant: 7,000,000 t of cement7.0MSilifke Ce…Körfez Cement Plant: 5,700,000 t of cement5.7MKörfez Cem…Ezine Cement Plant: 5,500,000 t of cement5.5MEzine Ceme…Yüreğir Cement Plant: 5,200,000 t of cement5.2MYüreğir Ce…Gönen Cement Plant: 5,000,000 t of cement5.0MGönen Ceme…ASCim Korkuteli Cement Plant: 4,300,000 t of cement4.3MASCim Kork…Bolu Merkez Cement Plant: 4,000,000 t of cement4.0MBolu Merke…Pazarcık Cement Plant: 4,000,000 t of cement4.0MPazarcık C…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Altıeylül Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 39.6°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
34/100environmental-severity index
19.5°Cseasonal temperature swing
78 kmdistance to coast
ModerateCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1359 W/m² to ambient — roughly 1.04× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #16 largest of 30 cement plants in Türkiye by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 39.60774, 27.87893. View on OpenStreetMap.

Frequently asked questions

What type of facility is Altıeylül Cement Plant?

Altıeylül Cement Plant is a cement plant in Türkiye. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Altıeylül Cement Plant?

The open dataset lists 2,323,750 t of cement of capacity for Altıeylül Cement Plant.

How much CO₂ does Altıeylül Cement Plant emit?

The page uses about 481,286 t CO₂e/year from the open dataset It ranks #54 among facilities in Türkiye by estimated CO₂.

Where is Altıeylül Cement Plant located?

Altıeylül Cement Plant is in Türkiye at approximately 39.60774, 27.87893.

Who operates Altıeylül Cement Plant?

The operator recorded in the open dataset is Limak Cimento Sanayi ve Ticaret AŞ.

Built from open public data; no personal information. Operate this site? Request a correction or removal.