Industrial carbon data for United Arab Emirates

Review the data status and reporting boundary before using a facility estimate or carbon-price input.

Review the facility dataOpen the methodology
01

Modelled facility data

FacilityModelled sectorEstimated t CO2, 2023
Taweelah Shaheen Alumina RefineryNot stated4,739,433
Borouge Abu Dhabi Polymers Co. Ltd. , Ruwais,Abu DhabiNot stated4,562,196
Taweelah-Abu Dhabi aluminium plantNot stated3,459,725
Emsteel Abu Dhabi plantNot stated2,617,390
Jebel Ali aluminium plantNot stated2,465,160

Source: Climate TRACE modelled estimates for 2023. These are not verified declarations, regulatory returns or current emissions. Check the facility identity, boundary, sector and reporting year before use.

02

Check the current carbon-pricing status

This page does not state that a national tax or emissions-trading system applies. It does not assign a zero price where no reviewed record is available.

World Bank Carbon Pricing Dashboard

Confirm the current instrument, covered entity, reporting year, allowance treatment and responsible authority using the applicable official source.

Inzonex removable modular insulation on industrial equipment
Equipment heat loss

Measure exposed hot surfaces

Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.

  • Design target: surface temperature at or below 45 °C, subject to the application and design review
  • Claimed heat-loss reduction: up to 96%, subject to the measured boundary and insulation specification
  • Removable construction for inspection and maintenance access
  • Calculation record available for the selected equipment and operating conditions

Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.

03

Use the data with its status

  1. Confirm the facility and operator.
  2. Confirm the installation and emissions boundary.
  3. Replace modelled data with a verified declaration where available.
  4. Apply a carbon-price input only to the emissions and period covered by that instrument.
  5. Record the source, date and review status.

Do not multiply total modelled facility emissions by a carbon price and describe the result as a tax, allowance obligation or CBAM liability.

04

Assess exposed hot equipment separately

Use measured geometry, surface temperature, ambient conditions, operating hours and the actual insulation boundary in the heat-loss calculator.

No standard country or site saving is assigned.

Regulatory source

Federal climate law in United Arab Emirates

Use the official legislation record to check whether a source is in scope and what measurement, inventory, reporting and retention duties apply.

Official source

Read the dated Inzonex briefing

Confirm the current text, scope and effective date before making a compliance or budget decision. This is not legal advice.

Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.