Home / Asia / Saudi Arabia / Petrochemical plants / Arabian Petrochemical Co. (Petrokemya North), Al Jubail,

Arabian Petrochemical Co. (Petrokemya North), Al Jubail,

Petrochemical in Saudi Arabia. Approximate location 27.05629, 49.59434.

PetrochemicalSaudi ArabiaCO₂ reported

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, is a petrochemical in Saudi Arabia with a reported capacity of 1,200,000 t of ethylene. It cracks hydrocarbon feedstocks into building-block chemicals such as ethylene and propylene. It is operated by Saudi Basic Industries Corp. By capacity it ranks #10 of 13 petrochemical plants tracked in Saudi Arabia. It emits about 1,651,410 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 384,944 cars.

1,200,000t of ethylene
1,651,410t CO₂e / yr (Climate TRACE)
#25CO₂ rank in Saudi Arabia
1.38t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-731931.

在上下文中:该设施如何比较

在1,200,000 t of ethylene时,Arabian Petrochemical Co. (Petrokemya North), Al Jubail,是Saudi Arabia中petrochemical的中位数约 1,450,000 t of ethylene。 子部门:petrochemical-steam-cracking。 作为petrochemical,它需要强烈的工艺热量(通常300–800°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 石化厂在非常高的温度下裂化烃,生产乙烯、丙烯和其他基础化学品——是最热强度密集的工业过程之一。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 1,651,410 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

384,944cars driven for a year
215,364homes' annual energy use
27,523,500tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest petrochemical plants in Saudi Arabia

Arabian Petrochemical Co. (Petrokemya South), Al Jubail,: 2,250,000 t of ethylene2.2MArabian Pe…Eastern Petrochemical Co. (SHARQ), Al Jubail,: 1,825,000 t of ethylene1.8MEastern Pe…Petro Rabigh, Rabigh,: 1,600,000 t of ethylene1.6MPetro Rabi…Yanbu Petrochemical Co. (Yanpet), Yanbu,: 1,600,000 t of ethylene1.6MYanbu Petr…Sadara Basic Services Company, Al Jubail,: 1,500,000 t of ethylene1.5MSadara Bas…Saudi Kayan Petrochemical Co. , Al Jubail,: 1,500,000 t of ethylene1.5MSaudi Kaya…Jubail United Petrochemical Co. , Al Jubail,: 1,450,000 t of ethylene1.4MJubail Uni…Yanbu National Petrochemical Company (Yansab), Yanbu,: 1,380,000 t of ethylene1.4MYanbu Nati…

Reported capacity (t of ethylene), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Saudi Basic Industries Corp. All facilities by this operator →

Local climate

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, sits in a hot desert climate zone (Köppen BWh), at 27.1°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #10 largest of 13 petrochemical plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 27.05629, 49.59434. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Arabian Petrochemical Co. (Petrokemya North), Al Jubail,?

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, is a petrochemical in Saudi Arabia. It cracks hydrocarbon feedstocks into building-block chemicals such as ethylene and propylene.

What is the capacity of Arabian Petrochemical Co. (Petrokemya North), Al Jubail,?

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, has a reported capacity of 1,200,000 t of ethylene.

How much CO₂ does Arabian Petrochemical Co. (Petrokemya North), Al Jubail, emit?

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, emits about 1,651,410 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 384,944 cars. That ranks #25 among tracked facilities in Saudi Arabia.

Where is Arabian Petrochemical Co. (Petrokemya North), Al Jubail, located?

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, is in Saudi Arabia, near coordinates 27.05629, 49.59434.

Who operates Arabian Petrochemical Co. (Petrokemya North), Al Jubail,?

Arabian Petrochemical Co. (Petrokemya North), Al Jubail, is operated by Saudi Basic Industries Corp.

Built from open public data; no personal information. Operate this site? Request a correction or removal.