Home / Asia / Pakistan / Steel plants / Amreli Steels Dhabeji plant

Amreli Steels Dhabeji plant

Steel Plant in Pakistan. Approximate location 24.80048, 67.50511.

Steel PlantPakistanCO₂ reported

Amreli Steels Dhabeji plant is a steel plant in Pakistan with a reported capacity of 1,200,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). By capacity it ranks #1 of 5 steel plants tracked in Pakistan. It emits about 1,199,271 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 279,550 cars. Its CO₂ per unit of capacity is about 85% above the median steel plant.

1,200,000t of steel
1,199,271t CO₂e / yr (Climate TRACE)
#18CO₂ rank in Pakistan
1.00t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42741841.

У контексті: як порівнюється це підприємство

При потужності 1,200,000 t of steel Amreli Steels Dhabeji plant — це значно вище медіана steel plant у Pakistan (800,000 t of steel). Підсектор: iron-and-steel. Як steel plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1500°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Сталеливарні заводи спалюють вугілля у доменних печах або використовують електричні дуги для плавлення брухту; в обох випадках розплавлений метал повинен перебувати вище 1500°C і транспортуватися через розширені гарячі трубопроводи та судини.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 1,199,271 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

279,550cars driven for a year
156,399homes' annual energy use
19,987,850tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Pakistan

Amreli Steels Dhabeji plant: 1,200,000 t of steel1.2MAmreli Ste…Mughal Iron & Steel Industries Lahore plant: 1,166,000 t of steel1.2MMughal Iro…Ittehad Steel Faisalabad plant: 800,000 t of steel800kIttehad St…Faizan Steel Karachi steel plant: 730,000 t of steel730kFaizan Ste…Agha Steel Industries Karachi plant: 450,000 t of steel450kAgha Steel…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Amreli Steels Dhabeji plant sits in a hot desert climate zone (Köppen BWh), at 24.8°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 5 steel plants in Pakistan by reported capacity.

Nearby industrial sites

Location

Coordinates 24.80048, 67.50511. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Amreli Steels Dhabeji plant?

Amreli Steels Dhabeji plant is a steel plant in Pakistan. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Amreli Steels Dhabeji plant?

Amreli Steels Dhabeji plant has a reported capacity of 1,200,000 t of steel.

How much CO₂ does Amreli Steels Dhabeji plant emit?

Amreli Steels Dhabeji plant emits about 1,199,271 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 279,550 cars. That ranks #18 among tracked facilities in Pakistan.

Where is Amreli Steels Dhabeji plant located?

Amreli Steels Dhabeji plant is in Pakistan, near coordinates 24.80048, 67.50511.

Built from open public data; no personal information. Operate this site? Request a correction or removal.