Home / Europe / Romania / Cement plants / Hoghiz Cement Plant

Hoghiz Cement Plant

Cement Plant in Romania. Approximate location 45.95187, 25.28206.

Cement PlantRomaniaCO₂ reported

Hoghiz Cement Plant is a cement plant in Romania with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by ROMCIM SA. By capacity it ranks #6 of 7 cement plants tracked in Romania. It emits about 427,645 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 99,684 cars. Its CO₂ per unit of capacity is about 21% below the median cement plant.

1,500,000t of cement
427,645t CO₂e / yr (Climate TRACE)
#13CO₂ rank in Romania
0.29t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439048.

Bağlamda: bu tesis nasıl karşılaştırılır

1,500,000 t of cement'de, Hoghiz Cement Plant Romania'daki cement plant'lerin medyanı altında 1,900,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 7%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 427,645 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

99,684cars driven for a year
55,770homes' annual energy use
7,127,417tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Romania

Medgidia Cement Plant: 3,400,000 t of cement3.4MMedgidia C…Bicaz Cement Plant: 3,000,000 t of cement3.0MBicaz Ceme…Fieni Cement Plant: 2,500,000 t of cement2.5MFieni Ceme…Chistag Cement Plant: 1,900,000 t of cement1.9MChistag Ce…Chiscadaga Cement Plant: 1,650,000 t of cement1.7MChiscadaga…Hoghiz Cement Plant: 1,500,000 t of cement1.5MHoghiz Cem…Valea Mare Pravat Cement Plant: 900,000 t of cement900kValea Mare…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by ROMCIM SA. All facilities by this operator →

Local climate

Hoghiz Cement Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 46.0°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 7 cement plants in Romania by reported capacity.

Nearby industrial sites

Location

Coordinates 45.95187, 25.28206. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Hoghiz Cement Plant?

Hoghiz Cement Plant is a cement plant in Romania. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Hoghiz Cement Plant?

Hoghiz Cement Plant has a reported capacity of 1,500,000 t of cement.

How much CO₂ does Hoghiz Cement Plant emit?

Hoghiz Cement Plant emits about 427,645 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 99,684 cars. That ranks #13 among tracked facilities in Romania.

Where is Hoghiz Cement Plant located?

Hoghiz Cement Plant is in Romania, near coordinates 45.95187, 25.28206.

Who operates Hoghiz Cement Plant?

Hoghiz Cement Plant is operated by ROMCIM SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.