Home / Africa / Egypt / Cement plants / El Sewedy Cement Attaka Plant

El Sewedy Cement Attaka Plant

Cement Plant in Egypt. Approximate location 29.74765, 32.21266.

Cement PlantEgyptCO₂ reported

El Sewedy Cement Attaka Plant is a cement plant in Egypt with a reported capacity of 3,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by El Sewedy Cement Co. By capacity it ranks #9 of 26 cement plants tracked in Egypt. It emits about 713,960 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 166,424 cars. Its CO₂ per unit of capacity is about 42% below the median cement plant.

3,400,000t of cement
713,960t CO₂e / yr (Climate TRACE)
#28CO₂ rank in Egypt
0.21t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896694.

В контексте: как это предприятие сравнивается

На мощности 3,400,000 t of cement El Sewedy Cement Attaka Plant — это значительно выше медианная cement plant в Egypt (2,690,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 41% ниже медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.

Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.

What 713,960 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

166,424cars driven for a year
93,109homes' annual energy use
11,899,333tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by El Sewedy Cement Co. All facilities by this operator →

Local climate

El Sewedy Cement Attaka Plant sits in a hot desert climate zone (Köppen BWh), at 29.7°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #9 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 29.74765, 32.21266. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is El Sewedy Cement Attaka Plant?

El Sewedy Cement Attaka Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of El Sewedy Cement Attaka Plant?

El Sewedy Cement Attaka Plant has a reported capacity of 3,400,000 t of cement.

How much CO₂ does El Sewedy Cement Attaka Plant emit?

El Sewedy Cement Attaka Plant emits about 713,960 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 166,424 cars. That ranks #28 among tracked facilities in Egypt.

Where is El Sewedy Cement Attaka Plant located?

El Sewedy Cement Attaka Plant is in Egypt, near coordinates 29.74765, 32.21266.

Who operates El Sewedy Cement Attaka Plant?

El Sewedy Cement Attaka Plant is operated by El Sewedy Cement Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.