Cement Plant in Egypt. Approximate location 29.79781, 32.14794.
Cement PlantEgyptCO₂ reported
Arabian Cement Attaka Plant is a cement plant in Egypt with a reported capacity of 5,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Arabian Cement Company SJSC. By capacity it ranks #6 of 26 cement plants tracked in Egypt. It emits about 2,376,325 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 553,922 cars. Its CO₂ per unit of capacity is about 32% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896673.
На мощности 5,000,000 t of cement Arabian Cement Attaka Plant — это значительно выше медианная cement plant в Egypt (2,690,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 32% выше медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.
Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Arabian Cement Company SJSC. All facilities by this operator →
Arabian Cement Attaka Plant sits in a hot desert climate zone (Köppen BWh), at 29.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 26 cement plants in Egypt by reported capacity.
Coordinates 29.79781, 32.14794. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Arabian Cement Attaka Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Arabian Cement Attaka Plant has a reported capacity of 5,000,000 t of cement.
Arabian Cement Attaka Plant emits about 2,376,325 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 553,922 cars. That ranks #6 among tracked facilities in Egypt.
Arabian Cement Attaka Plant is in Egypt, near coordinates 29.79781, 32.14794.
Arabian Cement Attaka Plant is operated by Arabian Cement Company SJSC.