Home / Africa / Egypt / Cement plants / Beni Mazar Cement Plant

Beni Mazar Cement Plant

Cement Plant in Egypt. Approximate location 28.41179, 30.96548.

Cement PlantEgyptCO₂ reported

Beni Mazar Cement Plant is a cement plant in Egypt with a reported capacity of 2,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Misr Cement Minya SAE. By capacity it ranks #17 of 26 cement plants tracked in Egypt. It emits about 308,734 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,966 cars. Its CO₂ per unit of capacity is about 61% below the median cement plant.

2,200,000t of cement
308,734t CO₂e / yr (Climate TRACE)
#49CO₂ rank in Egypt
0.14t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896685.

В контексте: как это предприятие сравнивается

На мощности 2,200,000 t of cement Beni Mazar Cement Plant — это примерно медианная cement plant в Egypt (2,690,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 61% ниже медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.

Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.

What 308,734 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

71,966cars driven for a year
40,263homes' annual energy use
5,145,567tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Misr Cement Minya SAE. All facilities by this operator →

Local climate

Beni Mazar Cement Plant sits in a hot desert climate zone (Köppen BWh), at 28.4°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #17 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 28.41179, 30.96548. View on OpenStreetMap.

Heat loss & insulation profile

A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 9,100 MWh/yr (≈ 3,100 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Beni Mazar Cement Plant?

Beni Mazar Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Beni Mazar Cement Plant?

Beni Mazar Cement Plant has a reported capacity of 2,200,000 t of cement.

How much CO₂ does Beni Mazar Cement Plant emit?

Beni Mazar Cement Plant emits about 308,734 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,966 cars. That ranks #49 among tracked facilities in Egypt.

Where is Beni Mazar Cement Plant located?

Beni Mazar Cement Plant is in Egypt, near coordinates 28.41179, 30.96548.

Who operates Beni Mazar Cement Plant?

Beni Mazar Cement Plant is operated by Misr Cement Minya SAE.

Built from open public data; no personal information. Operate this site? Request a correction or removal.