Cement Plant in Egypt. Approximate location 28.29704, 30.85628.
Cement PlantEgyptCO₂ reported
Al Minya Desert Cement Plant is a cement plant in Egypt with a reported capacity of 2,690,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Royal El Minya Cement Co. By capacity it ranks #13 of 26 cement plants tracked in Egypt. It emits about 1,995,545 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 465,162 cars. Its CO₂ per unit of capacity is about 106% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896688.
На мощности 2,690,000 t of cement Al Minya Desert Cement Plant — это примерно медианная cement plant в Egypt (2,690,000 t of cement). Его выброс CO₂ на единицу мощности примерно на 107% выше медианной cement plant. Подсектор: cement. Как cement plant, оно требует высокотемпературного технологического тепла (обычно 800–1400°C) для основных промышленных операций — тепла, которое должно подаваться котлами, печами или прямым сжиганием, и потери через неизолированные сосуды и трубопроводы представляют потраченное впустую топливо. Съёмная модульная теплоизоляция может снизить эти потери на 80–96%, охладив поверхность оборудования до ≤45°C, с окупаемостью часто менее 2 лет. Цементные заводы нагревают известняк до 1400°C во вращающихся печах — один из самых горячих промышленных процессов — и должны точно контролировать температуру по всей длине печи.
Сравнение производительности и интенсивности CO₂ рассчитано на основе данных промышленных объектов Climate TRACE; роль сектора основана на инженерных справочниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Royal El Minya Cement Co. All facilities by this operator →
Al Minya Desert Cement Plant sits in a hot desert climate zone (Köppen BWh), at 28.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #13 largest of 26 cement plants in Egypt by reported capacity.
Coordinates 28.29704, 30.85628. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Minya Desert Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Minya Desert Cement Plant has a reported capacity of 2,690,000 t of cement.
Al Minya Desert Cement Plant emits about 1,995,545 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 465,162 cars. That ranks #9 among tracked facilities in Egypt.
Al Minya Desert Cement Plant is in Egypt, near coordinates 28.29704, 30.85628.
Al Minya Desert Cement Plant is operated by Royal El Minya Cement Co.