Cement Plant in Spain. Approximate location 41.94132, -4.46577.
Cement PlantSpainCO₂ reported
Hontoria Cement Plant is a cement plant in Spain with a reported capacity of 815,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementos Portland Valderrivas SA. By capacity it ranks #25 of 29 cement plants tracked in Spain. It emits about 301,524 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 70,285 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438396.
Com 815,000 t of cement, Hontoria Cement Plant é abaixo de a mediana de cement plant em Spain (1,361,000 t of cement). Seu CO₂ por unidade de capacidade é aproximadamente 29% acima de a mediana de cement plant. Subsetor: cement. Como cement plant, requer calor de processo intenso (tipicamente 800–1400°C) para suas operações industriais centrais — calor que deve ser fornecido por caldeiras, fornos ou combustão direta, e as perdas através de vasos e tubulações não isolados representam combustível desperdiçado. O isolamento modular removível pode reduzir essas perdas em 80–96%, esfriando superfícies a ≤45°C, com payback geralmente inferior a 2 anos. As cimenteiras aquecem calcário a 1.400°C em fornos rotativos — um dos processos industriais mais quentes — e devem controlar a temperatura com precisão em todo o comprimento do forno.
Comparação de capacidade e intensidade de CO₂ calculada a partir dos dados de instalações industriais Climate TRACE; função do setor baseada em referência de engenharia.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cementos Portland Valderrivas SA. All facilities by this operator →
Hontoria Cement Plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 41.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #25 largest of 29 cement plants in Spain by reported capacity.
Coordinates 41.94132, -4.46577. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Hontoria Cement Plant is a cement plant in Spain. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Hontoria Cement Plant has a reported capacity of 815,000 t of cement.
Hontoria Cement Plant emits about 301,524 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 70,285 cars. That ranks #38 among tracked facilities in Spain.
Hontoria Cement Plant is in Spain, near coordinates 41.94132, -4.46577.
Hontoria Cement Plant is operated by Cementos Portland Valderrivas SA.