Home / Europe / Bulgaria / Cement plants / Zlatna Panega Cement Plant

Zlatna Panega Cement Plant — Bulgaria

Cement Plant in Bulgaria. Approximate location 43.08793, 24.17509.

Cement PlantBulgariaCO₂ estimate (modelled)

Zlatna Panega Cement Plant is a cement plant in Bulgaria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Zlatna Panega Cement AD. It emits about 724,709 t CO₂e a year from Climate TRACE. That is 17% of the CO₂e from the 10 facilities in Bulgaria that have an emissions figure in IndustryAtlas.

724,709t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Bulgaria

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437259.

Data status

Known source data

FacilityZlatna Panega Cement Plant Climate TRACE
CountryBulgaria Climate TRACE
Coordinates43.08793, 24.17509 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorZlatna Panega Cement AD Climate TRACE
Modelled CO₂e724,709 t/yr Climate TRACE

Calculated from the dataset

Bulgaria rank#2 of 10 · top 20.0% calculated
Global cement rank#745 of 2113 · top 35.3% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 724,709 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

4.0krailcars of coal burned
169kgasoline cars driven for a year
725kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 725k t CO₂e/yr (Scope 1), Zlatna Panega Cement Plant carries €61.9M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.

725k t CO₂e / yrScope 1 emissions
€61.9M/yrcarbon value · full EU ETS price

Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Operator

Operated by Zlatna Panega Cement AD.

Local climate

Zlatna Panega Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 43.1°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
31/100environmental-severity index
23.2°Cseasonal temperature swing
264 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1386 W/m² to ambient — roughly 1.07× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 43.08793, 24.17509. View on OpenStreetMap.

Frequently asked questions

What type of facility is Zlatna Panega Cement Plant?

Zlatna Panega Cement Plant is a cement plant in Bulgaria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does Zlatna Panega Cement Plant emit?

The page uses about 724,709 t CO₂e/year from the open dataset It ranks #2 among facilities in Bulgaria by estimated CO₂.

Where is Zlatna Panega Cement Plant located?

Zlatna Panega Cement Plant is in Bulgaria at approximately 43.08793, 24.17509.

Who operates Zlatna Panega Cement Plant?

The operator recorded in the open dataset is Zlatna Panega Cement AD.

Built from open public data; no personal information. Operate this site? Request a correction or removal.