Tororo Cement Plant — Uganda
Cement Plant in Uganda. Approximate location 0.66041, 34.1568.
Cement PlantUgandaCO₂ estimate (modelled)
Tororo Cement Plant is a cement plant in Uganda. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Tororo Cement Ltd. It emits about 722,073 t CO₂e a year from Climate TRACE. That is 61% of the CO₂e from the 4 facilities in Uganda that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439238.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Khammouance Cement Mahaxay Cement Plant · 722,229 t CO₂e/yr · Laos
- Deccan Cements Wadappally Cement Plant · 722,485 t CO₂e/yr · India
- He Duong Cement Hoa Lư Cement Plant · 721,289 t CO₂e/yr · Vietnam
- Juhayna West Cement Plant · 724,251 t CO₂e/yr · Egypt
- Zlatna Panega Cement Plant · 724,709 t CO₂e/yr · Bulgaria
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 722,073 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 722k t CO₂e/yr (Scope 1), Tororo Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 722k t at the EU CBAM rate (€75/t) is €54.4M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Tororo Cement Ltd.
Local climate
Tororo Cement Plant sits in a tropical monsoon climate zone (Köppen Am), at 0.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1277 W/m² to ambient — roughly 0.98× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Tembo Steels Iganga plant · Steel Plant · 151,894 t CO₂
- Modern Laminates Pulp Mill · Pulp & Paper Mill · 39,451 t CO₂
Location
Coordinates 0.66041, 34.1568. View on OpenStreetMap.
Frequently asked questions
What type of facility is Tororo Cement Plant?
Tororo Cement Plant is a cement plant in Uganda. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Tororo Cement Plant emit?
The page uses about 722,073 t CO₂e/year from the open dataset It ranks #1 among facilities in Uganda by estimated CO₂.
Where is Tororo Cement Plant located?
Tororo Cement Plant is in Uganda at approximately 0.66041, 34.1568.
Who operates Tororo Cement Plant?
The operator recorded in the open dataset is Tororo Cement Ltd.
