Ünye Ordu Cement Plant — Türkiye
Cement Plant in Türkiye. Approximate location 41.10794, 37.32425.
Cement PlantTürkiyeCO₂ estimate (modelled)
Ünye Ordu Cement Plant is a cement plant in Türkiye. Its listed capacity is 2,800,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Unye Cimento Sanayi ve Ticaret AŞ. By capacity it ranks #11 among 30 cement plants in Türkiye. It emits about 1,051,574 t CO₂e a year from Climate TRACE. That is 1.3% of the CO₂e from the 94 facilities in Türkiye that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439210.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Barroso Cement Plant · 1,052,724 t CO₂e/yr · Brazil
- Sinai El Hassana Cement Plant · 1,050,164 t CO₂e/yr · Egypt
- UltraTech Bela Cement Plant · 1,057,537 t CO₂e/yr · India
- Cerritos Cement Plant · 1,058,215 t CO₂e/yr · Mexico
- Heidelbergcement Damoh Cement Plant · 1,058,295 t CO₂e/yr · India
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Umut power station · Coal · 660 MW · 14 km
- Bilgin Samsun gas power station · Gas · 890 MW · 15 km
- Bilgin Samsun gas power station · Gas · 890 MW · 15 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 2,800,000 t of cement, Ünye Ordu Cement Plant is around the median cement plant in Türkiye (2,480,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 1,051,574 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 1.1M t CO₂e/yr (Scope 1), Ünye Ordu Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.1M t at the EU CBAM rate (€75/t) is €79.2M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Türkiye
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Unye Cimento Sanayi ve Ticaret AŞ.
Local climate
Ünye Ordu Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 41.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1384 W/m² to ambient — roughly 1.06× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #11 largest of 30 cement plants in Türkiye by listed capacity (Climate TRACE).
Nearby industrial sites
- Yesilyurt Iron and Steel Tekkekoy plant · Steel Plant · 82,763 t CO₂
- Askale Kavak Cement Plant · Cement Plant · 510,070 t CO₂
- Ladik Cement Plant · Cement Plant · 477,800 t CO₂
- Artova Cement Plant · Cement Plant · 991,988 t CO₂
- Sivas Merkez Cement Plant · Cement Plant · 829,342 t CO₂
Location
Coordinates 41.10794, 37.32425. View on OpenStreetMap.
Frequently asked questions
What type of facility is Ünye Ordu Cement Plant?
Ünye Ordu Cement Plant is a cement plant in Türkiye. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Ünye Ordu Cement Plant?
The open dataset lists 2,800,000 t of cement of capacity for Ünye Ordu Cement Plant.
How much CO₂ does Ünye Ordu Cement Plant emit?
The page uses about 1,051,574 t CO₂e/year from the open dataset It ranks #20 among facilities in Türkiye by estimated CO₂.
Where is Ünye Ordu Cement Plant located?
Ünye Ordu Cement Plant is in Türkiye at approximately 41.10794, 37.32425.
Who operates Ünye Ordu Cement Plant?
The operator recorded in the open dataset is Unye Cimento Sanayi ve Ticaret AŞ.
