Toronto Board Plant — Canada
Other Manufacturing in Canada. Approximate location 43.4952, -79.6148.
Other ManufacturingCanadaCO₂ estimate (modelled)
Toronto Board Plant is a manufacturing plant in Canada. Heavy manufacturing facilities run a range of heat-intensive processes (rubber, plastics, pressure vessels); maintaining process heat efficiently is critical to cost control. It emits about 35,557 t CO₂e a year from Climate TRACE. That is 0.05% of the CO₂e from the 127 facilities in Canada that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-3194312.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Weyerhaeuser NR- Columbia Falls · 35,412 t CO₂e/yr · United States
- West Fraser McDavid Lumber Mill · 35,780 t CO₂e/yr · United States
- STARPET INCORPORATED · 35,801 t CO₂e/yr · United States
- MERCURY MARINE FOND DU LAC COMPLEX · 35,972 t CO₂e/yr · United States
- SHPP US LLC · 34,945 t CO₂e/yr · United States
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Lakeview Generating Station · Coal · 2,400 MW · 10 km
- Britannia LFG · Biomass · 6 MW · 14 km
- Humber Treatment Plant · Biomass · 5 MW · 19 km
- Halton Hills · Gas · 683 MW · 20 km
- GTAA Cogeneration · Gas · 90 MW · 22 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: other-manufacturing. As manufacturing plant, it requires high process heat (typically 100–600°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Heavy manufacturing facilities run a range of heat-intensive processes (rubber, plastics, pressure vessels); maintaining process heat efficiently is critical to cost control.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 35,557 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 36k t CO₂e/yr (Scope 1), Toronto Board Plant carries no domestic carbon price, and its products are not CBAM-covered goods, so there is no border-carbon liability. At the EU ETS reference price (€75/t) the emissions carry an indicative carbon value of €2.7M/yr.
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Local climate
Toronto Board Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 43.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with thermal cycling the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1417 W/m² to ambient — roughly 1.09× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Petro-Canada Mississauga Lubricants Refinery · Refinery · 105,301 t CO₂
- Mississauga Cement Plant · Cement Plant · 527,094 t CO₂
- Etobicoke Casting Plant · Metals Plant · 9,171 t CO₂
- Meridian Brick - Burlington · Other Manufacturing · 21,726 t CO₂
- Meridian Brick - Burlington · Other Manufacturing · 21,693 t CO₂
- Meridian Brick - Aldershot · Other Manufacturing · 36,765 t CO₂
Location
Coordinates 43.4952, -79.6148. View on OpenStreetMap.
Frequently asked questions
What type of facility is Toronto Board Plant?
Toronto Board Plant is a manufacturing plant in Canada. Heavy manufacturing facilities run a range of heat-intensive processes (rubber, plastics, pressure vessels); maintaining process heat efficiently is critical to cost control.
How much CO₂ does Toronto Board Plant emit?
The page uses about 35,557 t CO₂e/year from the open dataset It ranks #109 among facilities in Canada by estimated CO₂.
Where is Toronto Board Plant located?
Toronto Board Plant is in Canada at approximately 43.4952, -79.6148.
