Home / Asia / China / Steel plants / Tianjin New Tiangang United Special Steel Co Ltd

Tianjin New Tiangang United Special Steel Co Ltd

Steel Plant in China. Approximate location 39.29906, 117.79848.

Steel PlantChinaCO₂ estimate (modelled)Status: retired (GEM)

Tianjin New Tiangang United Special Steel Co Ltd is a steel plant in China. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Tianjin Tiangang UNITED SPECIAL Steel Co Ltd. It emits about 6,480,425 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 1.5 million passenger cars.

retiredasset status (Global Energy Monitor)
6,480,425t CO₂e / yr (Climate TRACE)
#88CO₂ rank in China

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566662.

Data status

Known source data

FacilityTianjin New Tiangang United Special Steel Co Ltd Climate TRACE
CountryChina Climate TRACE
Coordinates39.29906, 117.79848 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Owner / operatorTianjin Tiangang UNITED SPECIAL Steel Co Ltd Climate TRACE
GEM steel parentBritish Asia Pan Ruogen International Co Ltd [59.2%]; other shareholders [40.8%] Global Energy Monitor
Steel process routeironmaking BF Global Energy Monitor
Steel asset statusretired Global Energy Monitor
Steel equipmentBF Global Energy Monitor
Modelled CO₂e6,480,425 t/yr Climate TRACE

Calculated from the dataset

China rank#88 of 1485 · top 5.9% calculated
Global iron-and-steel rank#117 of 868 · top 13.5% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 6,480,425 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

1.5 millioncars driven for a year
845khomes' annual energy use
108 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 6.5M t CO₂e/yr (Scope 1), Tianjin New Tiangang United Special Steel Co Ltd carries no domestic carbon price — and as a CBAM-covered product, its 6.5M t at the EU CBAM rate (€75/t) is €488M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈130k t–324k t/yr, worth €9.8M€24.4M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

6.5M t CO₂e / yrScope 1 emissions
€488M/yrCBAM exposure on EU exports
130k t–324k t/yr ≈ €9.8M€24.4MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Operator

Operated by Tianjin Tiangang UNITED SPECIAL Steel Co Ltd.

Local climate

Tianjin New Tiangang United Special Steel Co Ltd sits in a monsoon hot-summer continental climate zone (Köppen Dwa), at 39.3°N in the northern hemisphere.

~10°Ctypical annual mean
~25°Ctypical warm-season
Monsoon hot-summer continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a corrosive environment (estimated ISO 9223 class C4 — High), with thermal cycling the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
45/100environmental-severity index
30.2°Cseasonal temperature swing
39 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1381 W/m² to ambient — roughly 1.06× the loss at a 20 °C reference; removable insulation recovers about 1312 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 39.29906, 117.79848. View on OpenStreetMap.

Heat loss & insulation profile

For a steel plant, the main modular-insulation targets are reheat & annealing furnaces, ladles, hot-blast stoves, steam & gas ducting. Typical hot-surface ranges used for screening: 200–1,200 °C.

Indicative recoverable energy

A first-pass insulation screen suggests about 7,800 MWh/year of recoverable heat-loss reduction and about 2,700 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Tianjin New Tiangang United Special Steel Co Ltd?

Tianjin New Tiangang United Special Steel Co Ltd is a steel plant in China. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

How much CO₂ does Tianjin New Tiangang United Special Steel Co Ltd emit?

The page uses about 6,480,425 t CO₂e/year from the open dataset It ranks #88 among facilities in China by estimated CO₂.

Where is Tianjin New Tiangang United Special Steel Co Ltd located?

Tianjin New Tiangang United Special Steel Co Ltd is in China at approximately 39.29906, 117.79848.

Who operates Tianjin New Tiangang United Special Steel Co Ltd?

The operator recorded in the open dataset is Tianjin Tiangang UNITED SPECIAL Steel Co Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.