Temara Cement Plant — Morocco
Cement Plant in Morocco. Approximate location 33.89053, -6.9488.
Cement PlantMoroccoCO₂ estimate (modelled)
Temara Cement Plant is a cement plant in Morocco. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Asment de Temara SA. It emits about 459,142 t CO₂e a year from Climate TRACE. That is 5.8% of the CO₂e from the 19 facilities in Morocco that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897469.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Star Cement East Jaintia Hills Cement Plant · 458,947 t CO₂e/yr · India
- El Carmen Cement Plant · 459,502 t CO₂e/yr · Argentina
- UNACEM Tehachapi Cement Plant · 458,407 t CO₂e/yr · United States
- Monay Cement Plant · 460,340 t CO₂e/yr · Venezuela
- Fauji Cement Wah Cement Plant · 460,385 t CO₂e/yr · Pakistan
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 459,142 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 459k t CO₂e/yr (Scope 1), Temara Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 459k t at the EU CBAM rate (€75/t) is €34.6M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Asment de Temara SA.
Local climate
Temara Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 33.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1325 W/m² to ambient — roughly 1.02× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Samir Mohammedia Refinery · Refinery
- Mahgreb Steel Casablanca plant · Steel Plant · 114,901 t CO₂
- Univers Acier Sidi Hajjaj steel plant · Steel Plant · 114,901 t CO₂
- La Cellulose du Maroc - Sidi Yahia du Gharb Mill · Pulp & Paper Mill · 2,905 t CO₂
- Lafarge Settat Cement Plant 2 · Cement Plant · 1,508,077 t CO₂
- Loulad Cement Plant · Cement Plant · 305,680 t CO₂
Location
Coordinates 33.89053, -6.9488. View on OpenStreetMap.
Frequently asked questions
What type of facility is Temara Cement Plant?
Temara Cement Plant is a cement plant in Morocco. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Temara Cement Plant emit?
The page uses about 459,142 t CO₂e/year from the open dataset It ranks #8 among facilities in Morocco by estimated CO₂.
Where is Temara Cement Plant located?
Temara Cement Plant is in Morocco at approximately 33.89053, -6.9488.
Who operates Temara Cement Plant?
The operator recorded in the open dataset is Asment de Temara SA.
