Monay Cement Plant — Venezuela
Cement Plant in Venezuela. Approximate location 9.61889, -70.41973.
Cement PlantVenezuelaCO₂ estimate (modelled)
Monay Cement Plant is a cement plant in Venezuela. Its listed capacity is 1,350,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Corporacion Socialista del Cemento. By capacity it ranks #4 among 9 cement plants in Venezuela. It emits about 460,340 t CO₂e a year from Climate TRACE. That is 2.6% of the CO₂e from the 19 facilities in Venezuela that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 6% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1898071.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Fauji Cement Wah Cement Plant · 460,385 t CO₂e/yr · Pakistan
- Prachovice Cement Plant · 460,660 t CO₂e/yr · Czechia
- Dowlat Abad Cement Plant · 461,120 t CO₂e/yr · Iran
- El Carmen Cement Plant · 459,502 t CO₂e/yr · Argentina
- Qaim Cement Plant · 461,451 t CO₂e/yr · Iraq
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
At 1,350,000 t of cement, Monay Cement Plant is around the median cement plant in Venezuela (1,210,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 460,340 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 460k t CO₂e/yr (Scope 1), Monay Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 460k t at the EU CBAM rate (€75/t) is €34.7M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Venezuela
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Corporacion Socialista del Cemento. All facilities by this operator →
Local climate
Monay Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 9.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1218 W/m² to ambient — roughly 0.94× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #4 largest of 9 cement plants in Venezuela by listed capacity (Climate TRACE).
Nearby industrial sites
- Lara Cement Plant · Cement Plant · 299,220 t CO₂
- Cumarebo Cement Plant · Cement Plant · 620,214 t CO₂
Location
Coordinates 9.61889, -70.41973. View on OpenStreetMap.
Frequently asked questions
What type of facility is Monay Cement Plant?
Monay Cement Plant is a cement plant in Venezuela. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Monay Cement Plant?
The open dataset lists 1,350,000 t of cement of capacity for Monay Cement Plant.
How much CO₂ does Monay Cement Plant emit?
The page uses about 460,340 t CO₂e/year from the open dataset It ranks #9 among facilities in Venezuela by estimated CO₂.
Where is Monay Cement Plant located?
Monay Cement Plant is in Venezuela at approximately 9.61889, -70.41973.
Who operates Monay Cement Plant?
The operator recorded in the open dataset is Corporacion Socialista del Cemento.
