Home / Asia / Iran / Petrochemical plants / Tabriz Petrochemical Co. , Tabriz,East Azerbaijan

Tabriz Petrochemical Co. , Tabriz,East Azerbaijan

Petrochemical in Iran. Approximate location 38.0715, 46.14705.

PetrochemicalIranCO₂ estimate (modelled)

Tabriz Petrochemical Co. , Tabriz,East Azerbaijan is a petrochemical in Iran. Its listed capacity is 136,000 t of ethylene. Petrochemical plants crack hydrocarbons at very high temperatures to produce ethylene, propylene and other building-block chemicals — one of the most heat-intensive industrial processes. It is operated by Omid Shares Management and Investment Co. By capacity it ranks #7 among 7 petrochemical plants in Iran. It emits about 190,966 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 45k passenger cars. Its CO₂ per unit of capacity is 8% above the national median for this sector.

136,000t of ethylene
190,966t CO₂e / yr (Climate TRACE)
#113CO₂ rank in Iran
1.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-731913.

Data status

Known source data

FacilityTabriz Petrochemical Co. , Tabriz,East Azerbaijan Climate TRACE
CountryIran Climate TRACE
Coordinates38.0715, 46.14705 Climate TRACE
Sector / subsectorpetrochemical-steam-cracking Climate TRACE
Reported capacity136,000 t of ethylene Climate TRACE
Owner / operatorOmid Shares Management and Investment Co Climate TRACE
Modelled CO₂e190,966 t/yr Climate TRACE

Calculated from the dataset

Iran rank#113 of 126 · top 89.7% calculated
Global petrochemical-steam-cracking rank#205 of 218 · top 94.0% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 136,000 t of ethylene, Tabriz Petrochemical Co. , Tabriz,East Azerbaijan is below the median petrochemical in Iran (520,000 t of ethylene). Subsector: petrochemical-steam-cracking. As petrochemical, it requires high process heat (typically 300–800°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Petrochemical plants crack hydrocarbons at very high temperatures to produce ethylene, propylene and other building-block chemicals — one of the most heat-intensive industrial processes.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 190,966 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

45kcars driven for a year
25khomes' annual energy use
3.2 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 191k t CO₂e/yr (Scope 1), Tabriz Petrochemical Co. , Tabriz,East Azerbaijan carries no domestic carbon price; petrochemicals are not a CBAM-covered good, so there is no border-carbon liability. At the EU ETS reference price (€75/t) the emissions carry an indicative carbon value of €14.4M/yr. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈4k t–10k t/yr, worth €288k€720k, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

191k t CO₂e / yrScope 1 emissions
€14.4M/yrindicative carbon value (not a CBAM liability)
4k t–10k t/yr ≈ €288k€720kDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest petrochemical plants in Iran

Jam Petrochemical Co. (10th Olefin omplex), Assaluyeh,Bushehr: 1,320,000 t of ethylene1.3MJam Petroc…Arya Sasol Polymer Co. (9th Olefin complex), Assaluyeh,Bushehr: 1,050,000 t of ethylene1.1MArya Sasol…Bandar Imam Petrochemical Co. , Bandar Imam Khommeini,Khuzekstan: 565,000 t of ethylene565kBandar Ima…Amir Kabir Petrochemical Co. (6th Olefin complex), Bandar Imam Khommeini,Khuzekstan: 520,000 t of ethylene520kAmir Kabir…Ilam Petrochemical Company (13th Olefin complex), Lashekan,Ilamm: 450,000 t of ethylene450kIlam Petro…(Shazand) Arak Petrochemical, Arak,Marzaki: 306,000 t of ethylene306k(Shazand) …Tabriz Petrochemical Co. , Tabriz,East Azerbaijan: 136,000 t of ethylene136kTabriz Pet…

Listed capacity (t of ethylene), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Omid Shares Management and Investment Co.

Local climate

Tabriz Petrochemical Co. , Tabriz,East Azerbaijan sits in a cold semi-arid steppe climate zone (Köppen BSk), at 38.1°N in the northern hemisphere.

~10°Ctypical annual mean
~23°Ctypical warm-season
Cold semi-arid steppe: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.

C1ISO 9223 corrosivity (indicative)
39/100environmental-severity index
27.7°Cseasonal temperature swing
227 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1400 W/m² to ambient — roughly 1.08× the loss at a 20 °C reference; removable insulation recovers about 1330 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #7 largest of 7 petrochemical plants in Iran by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 38.0715, 46.14705. View on OpenStreetMap.

Heat loss & insulation profile

For a petrochemical, the main modular-insulation targets are steam crackers, quench towers, fractionators, heat exchangers, steam lines, valves & flanges. Typical hot-surface ranges used for screening: 150–550 °C.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Tabriz Petrochemical Co. , Tabriz,East Azerbaijan?

Tabriz Petrochemical Co. , Tabriz,East Azerbaijan is a petrochemical in Iran. Petrochemical plants crack hydrocarbons at very high temperatures to produce ethylene, propylene and other building-block chemicals — one of the most heat-intensive industrial processes.

What capacity is listed for Tabriz Petrochemical Co. , Tabriz,East Azerbaijan?

The open dataset lists 136,000 t of ethylene of capacity for Tabriz Petrochemical Co. , Tabriz,East Azerbaijan.

How much CO₂ does Tabriz Petrochemical Co. , Tabriz,East Azerbaijan emit?

The page uses about 190,966 t CO₂e/year from the open dataset It ranks #113 among facilities in Iran by estimated CO₂.

Where is Tabriz Petrochemical Co. , Tabriz,East Azerbaijan located?

Tabriz Petrochemical Co. , Tabriz,East Azerbaijan is in Iran at approximately 38.0715, 46.14705.

Who operates Tabriz Petrochemical Co. , Tabriz,East Azerbaijan?

The operator recorded in the open dataset is Omid Shares Management and Investment Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.