Home / Europe / Austria / Cement plants / Retznei Cement Plant

Retznei Cement Plant

Cement Plant in Austria. Approximate location 46.73753, 15.57336.

Cement PlantAustriaCO₂ estimate (modelled)

Retznei Cement Plant is a cement plant in Austria. Its listed capacity is 625,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Holcim (Österreich) GmbH. It emits about 348,955 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 81k passenger cars. Its CO₂ per unit of capacity is 54% above the national median for this sector.

625,000t of cement
348,955t CO₂e / yr (Climate TRACE)
#7CO₂ rank in Austria
0.56t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437242.

Data status

Known source data

FacilityRetznei Cement Plant Climate TRACE
CountryAustria Climate TRACE
Coordinates46.73753, 15.57336 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity625,000 t of cement Climate TRACE
Owner / operatorHolcim (Österreich) GmbH Climate TRACE
Modelled CO₂e348,955 t/yr Climate TRACE
Measured CO₂ cross-check262,865 t/yr measured cross-check · EUTL 2023

Calculated from the dataset

Austria rank#7 of 15 · top 46.7% calculated
Global cement rank#1533 of 2113 · top 72.6% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 625,000 t of cement, Retznei Cement Plant is around the median cement plant in Austria (625,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 348,955 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

81kcars driven for a year
46khomes' annual energy use
5.8 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 349k t CO₂e/yr (Scope 1), Retznei Cement Plant carries €27.7M/yr of carbon at the full EU ETS price (€79/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈7k t–17k t/yr, worth €555k€1.4M, with payback up to 2 years.

Measured CO₂: 263k t/yr — verified EUTL (reporting year 2023) (25% below the modelled estimate). Modelled estimate 349k t/yr (Climate TRACE), high-confidence match, cross-checked via the measured-vs-modelled dataset (n=711).

349k t CO₂e / yrScope 1 emissions
€27.7M/yrcarbon value · full EU ETS price
7k t–17k t/yr ≈ €555k€1.4MDecarbonization potential

Carbon price: EU ETS €79/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: measured (EUTL RY2023), cross-checked vs Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Operator

Operated by Holcim (Österreich) GmbH. All facilities by this operator →

Local climate

Retznei Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 46.7°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
28/100environmental-severity index
20.5°Cseasonal temperature swing
209 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1406 W/m² to ambient — roughly 1.08× the loss at a 20 °C reference; removable insulation recovers about 1336 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 46.73753, 15.57336. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 9,400 MWh/year of recoverable heat-loss reduction and about 3,200 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

Austria: funding & obligation

Funding. Federal environmental support for energy-efficiency & process measures in industry (rates vary by measure). official source · verified 2026
Status: Confirm current call/rates per measure.

Obligation. Large companies (>249 employees OR >EUR 50M turnover OR >EUR 43M balance) must run an energy audit (EN 16247-1) every 4 years OR a certified EnMS (ISO 50001). (applies as a rule above the stated threshold — we do not hold this site's metered energy use). official source · verified 2026

Programme terms verified 2026-06-18; confirm the current open phase before applying. Eligibility depends on a site's energy use / headcount, which we do not hold — not a per-facility eligibility determination.

Frequently asked questions

What type of facility is Retznei Cement Plant?

Retznei Cement Plant is a cement plant in Austria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Retznei Cement Plant?

The open dataset lists 625,000 t of cement of capacity for Retznei Cement Plant.

How much CO₂ does Retznei Cement Plant emit?

The page uses about 348,955 t CO₂e/year from the open dataset It ranks #7 among facilities in Austria by estimated CO₂.

Where is Retznei Cement Plant located?

Retznei Cement Plant is in Austria at approximately 46.73753, 15.57336.

Who operates Retznei Cement Plant?

The operator recorded in the open dataset is Holcim (Österreich) GmbH.

Built from open public data; no personal information. Operate this site? Request a correction or removal.