PT Chandra asri Petrochemical, Asri Cilegon, West Java — Indonesia
Petrochemical in Indonesia. Approximate location -6.03871, 105.9329.
PetrochemicalIndonesiaCO₂ estimate (modelled)
PT Chandra asri Petrochemical, Asri Cilegon, West Java is a petrochemical plant in Indonesia. Its listed capacity is 900,000 t of ethylene. Petrochemical plants crack hydrocarbons at very high temperatures to produce ethylene, propylene and other building-block chemicals — one of the most heat-intensive industrial processes. It is operated by PT Top Investment Indonesia. It emits about 1,854,911 t CO₂e a year from Climate TRACE. That is 2.6% of the CO₂e from the 53 facilities in Indonesia that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 58% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-731948.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Yanbu National Petrochemical Company (Yansab), Yanbu, · 1,855,025 t CO₂e/yr · Saudi Arabia
- Jam Petrochemical Co. (10th Olefin omplex), Assaluyeh,Bushehr · 1,853,494 t CO₂e/yr · Iran
- Braskem Camacari Complex, Camacari,Bahia · 1,851,240 t CO₂e/yr · Brazil
- SCGC Rayong Olefins (ROC), Map Ta Phut, Rayong · 1,845,816 t CO₂e/yr · Thailand
- Chinese Petroleum Corp. , Taiwan, Linyuan · 1,880,839 t CO₂e/yr · Taiwan
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Asahimas Chemical power station · Coal · 300 MW · 2 km
- Cilegon PTIP Power Station · Coal · 40 MW · 3 km
- PLTGU Krakatau Daya Listrik (KDL) · Gas · 400 MW · 8 km
- PLTG Krakatau Posco Energy · Gas · 200 MW · 8 km
- Jawa-7 power station · Coal · 1,982 MW · 19 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 900,000 t of ethylene, PT Chandra asri Petrochemical, Asri Cilegon, West Java is around the median petrochemical plant in Indonesia (900,000 t of ethylene). Subsector: petrochemical-steam-cracking. As petrochemical plant, it requires high process heat (typically 300–800°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Petrochemical plants crack hydrocarbons at very high temperatures to produce ethylene, propylene and other building-block chemicals — one of the most heat-intensive industrial processes.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 1,854,911 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 1.9M t CO₂e/yr (Scope 1), PT Chandra asri Petrochemical, Asri Cilegon, West Java carries no domestic carbon price, and its products are not CBAM-covered goods, so there is no border-carbon liability. At the EU ETS reference price (€75/t) the emissions carry an indicative carbon value of €140M/yr.
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by PT Top Investment Indonesia. All facilities by this operator →
Local climate
PT Chandra asri Petrochemical, Asri Cilegon, West Java sits in a tropical rainforest climate zone (Köppen Af), at 6.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1240 W/m² to ambient — roughly 0.95× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- KS Posco Cilegon steel plant · Steel Plant · 4,575,957 t CO₂
- Krakatau Steel Cilegon plant · Steel Plant · 817,753 t CO₂
- IKPP P.T. Indah Kiat Pulp & Paper TbK - Serang Mill · Pulp & Paper Mill · 810,636 t CO₂
- IKPP P.T. Indah Kiat Pulp & Paper TbK - Tangerang Mill · Pulp & Paper Mill · 810,636 t CO₂
- Cemindo Gemilang Bayah Cement Plant · Cement Plant · 1,161,305 t CO₂
- Master Steel Jakarta Steel plant · Steel Plant · 272,601 t CO₂
Location
Coordinates -6.03871, 105.9329. View on OpenStreetMap.
Frequently asked questions
What type of facility is PT Chandra asri Petrochemical, Asri Cilegon, West Java?
PT Chandra asri Petrochemical, Asri Cilegon, West Java is a petrochemical plant in Indonesia. Petrochemical plants crack hydrocarbons at very high temperatures to produce ethylene, propylene and other building-block chemicals — one of the most heat-intensive industrial processes.
What capacity is listed for PT Chandra asri Petrochemical, Asri Cilegon, West Java?
The open dataset lists 900,000 t of ethylene of capacity for PT Chandra asri Petrochemical, Asri Cilegon, West Java.
How much CO₂ does PT Chandra asri Petrochemical, Asri Cilegon, West Java emit?
The page uses about 1,854,911 t CO₂e/year from the open dataset It ranks #10 among facilities in Indonesia by estimated CO₂.
Where is PT Chandra asri Petrochemical, Asri Cilegon, West Java located?
PT Chandra asri Petrochemical, Asri Cilegon, West Java is in Indonesia at approximately -6.03871, 105.9329.
Who operates PT Chandra asri Petrochemical, Asri Cilegon, West Java?
The operator recorded in the open dataset is PT Top Investment Indonesia.