Krakatau Steel Cilegon plant — Indonesia
Steel Plant in Indonesia. Approximate location -6.00223, 106.00026.
Steel PlantIndonesiaCO₂ estimate (modelled)
Krakatau Steel Cilegon plant is a steel plant in Indonesia. Its listed capacity is 4,000,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by PT Krakatau Steel (Persero) Tbk. By capacity it ranks #2 among 5 steel plants in Indonesia. It emits about 817,753 t CO₂e a year from Climate TRACE. That is 1.1% of the CO₂e from the 53 facilities in Indonesia that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 78% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566836.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- BlueScope New Zealand Steel Glenbrook · 814,187 t CO₂e/yr · New Zealand
- Lion Industries Megasteel plant · 813,464 t CO₂e/yr · Malaysia
- ArcelorMittal Hamburg steel plant · 822,412 t CO₂e/yr · Germany
- Nucor Steel Gallatin plant · 811,291 t CO₂e/yr · United States
- Lanxin Steel Group Co Ltd plant · 824,850 t CO₂e/yr · China
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- PLTG Krakatau Posco Energy · Gas · 200 MW · 1 km
- PLTGU Krakatau Daya Listrik (KDL) · Gas · 400 MW · 2 km
- Cilegon PTIP Power Station · Coal · 40 MW · 6 km
- Asahimas Chemical power station · Coal · 300 MW · 7 km
- Bojonegara Serang power station · Coal · 750 MW · 11 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 4,000,000 t of steel, Krakatau Steel Cilegon plant is well above the median steel plant in Indonesia (2,800,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 817,753 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 818k t CO₂e/yr (Scope 1), Krakatau Steel Cilegon plant carries no domestic carbon price — and as a CBAM-covered product, its 818k t at the EU CBAM rate (€75/t) is €61.6M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest steel plants in Indonesia
Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by PT Krakatau Steel (Persero) Tbk.
Local climate
Krakatau Steel Cilegon plant sits in a tropical rainforest climate zone (Köppen Af), at 6.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1240 W/m² to ambient — roughly 0.95× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #2 largest of 5 steel plants in Indonesia by listed capacity (Climate TRACE).
Nearby industrial sites
- KS Posco Cilegon steel plant · Steel Plant · 4,575,957 t CO₂
- PT Chandra asri Petrochemical, Asri Cilegon, West Java · Petrochemical · 1,854,911 t CO₂
- IKPP P.T. Indah Kiat Pulp & Paper TbK - Serang Mill · Pulp & Paper Mill · 810,636 t CO₂
- IKPP P.T. Indah Kiat Pulp & Paper TbK - Tangerang Mill · Pulp & Paper Mill · 810,636 t CO₂
- Master Steel Jakarta Steel plant · Steel Plant · 272,601 t CO₂
- Jakarta Prima Steel Industries plant · Steel Plant · 163,561 t CO₂
Location
Coordinates -6.00223, 106.00026. View on OpenStreetMap.
Frequently asked questions
What type of facility is Krakatau Steel Cilegon plant?
Krakatau Steel Cilegon plant is a steel plant in Indonesia. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for Krakatau Steel Cilegon plant?
The open dataset lists 4,000,000 t of steel of capacity for Krakatau Steel Cilegon plant.
How much CO₂ does Krakatau Steel Cilegon plant emit?
The page uses about 817,753 t CO₂e/year from the open dataset It ranks #27 among facilities in Indonesia by estimated CO₂.
Where is Krakatau Steel Cilegon plant located?
Krakatau Steel Cilegon plant is in Indonesia at approximately -6.00223, 106.00026.
Who operates Krakatau Steel Cilegon plant?
The operator recorded in the open dataset is PT Krakatau Steel (Persero) Tbk.
