Mescier Iron and Steel Bartin plant — Türkiye
Steel Plant in Türkiye. Approximate location 41.56564, 32.42929.
Steel PlantTürkiyeCO₂ estimate (modelled)
Mescier Iron and Steel Bartin plant is a steel plant in Türkiye. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Mescier Demir Celik AŞ. It emits about 51,759 t CO₂e a year from Climate TRACE. That is 0.06% of the CO₂e from the 94 facilities in Türkiye that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567077.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Thy Marcinelle Charleroi steel plant · 51,699 t CO₂e/yr · Belgium
- JFE Bars & Shapes Himeji Works steel plant · 52,049 t CO₂e/yr · Japan
- Ori Martin Brescia steel plant · 52,279 t CO₂e/yr · Italy
- CMC Steel Texas plant · 52,339 t CO₂e/yr · United States
- Steel Dynamics Engineered Bar Products steel plant · 52,728 t CO₂e/yr · United States
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Zafer power station · Coal · 1,320 MW · 8 km
- HEMA Amasra power station · Coal · 1,320 MW · 19 km
- Amasra Bartın power station · Coal · 1,200 MW · 19 km
- Saltukova power station · Coal · 350 MW · 28 km
- Filyos power station · Coal · 1,600 MW · 31 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 51,759 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 52k t CO₂e/yr (Scope 1), Mescier Iron and Steel Bartin plant carries no domestic carbon price — and as a CBAM-covered product, its 52k t at the EU CBAM rate (€75/t) is €3.9M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Mescier Demir Celik AŞ.
Local climate
Mescier Iron and Steel Bartin plant sits in a humid subtropical climate zone (Köppen Cfa), at 41.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1383 W/m² to ambient — roughly 1.06× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Sanko Bartin Cement Plant · Cement Plant · 1,548,905 t CO₂
- Kardemir Merkez steel plant · Steel Plant · 4,367,749 t CO₂
- Erdemir Eregli steel plant · Steel Plant · 4,724,148 t CO₂
- Bolu Merkez Cement Plant · Cement Plant · 1,640,012 t CO₂
- Marmara Hoşafoğlu Cement Plant · Cement Plant · 918,125 t CO₂
Location
Coordinates 41.56564, 32.42929. View on OpenStreetMap.
Frequently asked questions
What type of facility is Mescier Iron and Steel Bartin plant?
Mescier Iron and Steel Bartin plant is a steel plant in Türkiye. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
How much CO₂ does Mescier Iron and Steel Bartin plant emit?
The page uses about 51,759 t CO₂e/year from the open dataset It ranks #92 among facilities in Türkiye by estimated CO₂.
Where is Mescier Iron and Steel Bartin plant located?
Mescier Iron and Steel Bartin plant is in Türkiye at approximately 41.56564, 32.42929.
Who operates Mescier Iron and Steel Bartin plant?
The operator recorded in the open dataset is Mescier Demir Celik AŞ.
