Huta Czestochowa steel plant — Poland
Steel Plant in Poland. Approximate location 50.78096, 19.16473.
Steel PlantPolandCO₂ estimate (modelled)
Huta Czestochowa steel plant is a steel plant in Poland. Its listed capacity is 840,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Liberty Steel Group. By capacity it ranks #4 among 5 steel plants in Poland. It emits about 45,240 t CO₂e a year from Climate TRACE. That is 0.19% of the CO₂e from the 29 facilities in Poland that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 94% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567005.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Gerdau Siderperu Chimbote steel plant · 45,306 t CO₂e/yr · Peru
- Swiss Steel Emmenbrücke plant · 45,547 t CO₂e/yr · Switzerland
- Ferriera Valsabbia Odolo steel plant · 44,925 t CO₂e/yr · Italy
- Gerdau Petersburg Steel Mill · 45,568 t CO₂e/yr · United States
- Outokumpu Avesta steel plant · 45,577 t CO₂e/yr · Sweden
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- EC Fortum · Coal · 68 MW · 6 km
- Lagisza power station · Gas · 413 MW · 48 km
- Łagisza · Coal · 700 MW · 48 km
- EC Nowa · Coal · 150 MW · 49 km
- ZW Nowa power station · Coal · 180 MW · 49 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 840,000 t of steel, Huta Czestochowa steel plant is around the median steel plant in Poland (900,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 45,240 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 45k t CO₂e/yr (Scope 1), Huta Czestochowa steel plant carries €3.9M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest steel plants in Poland
Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Liberty Steel Group. All facilities by this operator →
Local climate
Huta Czestochowa steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1420 W/m² to ambient — roughly 1.09× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #4 largest of 5 steel plants in Poland by listed capacity (Climate TRACE).
Nearby industrial sites
- Rudniki Cement Plant · Cement Plant · 232,119 t CO₂
- Schumacher Packaging Myszków Pulp Mill · Pulp & Paper Mill
- Okręgowa Spółdzielnia Mleczarska W Radomsku · Food & Beverage
- CMC Zawiercie steel plant · Steel Plant · 165,261 t CO₂
- Trebaczew Cement Plant · Cement Plant · 1,195,359 t CO₂
- ArcelorMittal Dąbrowa Górnicza steel plant · Steel Plant · 7,515,326 t CO₂
Location
Coordinates 50.78096, 19.16473. View on OpenStreetMap.
Frequently asked questions
What type of facility is Huta Czestochowa steel plant?
Huta Czestochowa steel plant is a steel plant in Poland. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for Huta Czestochowa steel plant?
The open dataset lists 840,000 t of steel of capacity for Huta Czestochowa steel plant.
How much CO₂ does Huta Czestochowa steel plant emit?
The page uses about 45,240 t CO₂e/year from the open dataset It ranks #26 among facilities in Poland by estimated CO₂.
Where is Huta Czestochowa steel plant located?
Huta Czestochowa steel plant is in Poland at approximately 50.78096, 19.16473.
Who operates Huta Czestochowa steel plant?
The operator recorded in the open dataset is Liberty Steel Group.