Hetauda Cement Hetauda Cement Plant — Nepal
Cement Plant in Nepal. Approximate location 27.40966, 85.0136.
Cement PlantNepalCO₂ estimate (modelled)
Hetauda Cement Hetauda Cement Plant is a cement plant in Nepal. Its listed capacity is 182,500 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Hetauda Cement Industries Ltd. By capacity it ranks #15 among 21 cement plants in Nepal. It emits about 66,314 t CO₂e a year from Climate TRACE. That is 1.0% of the CO₂e from the 25 facilities in Nepal that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438966.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Mawmluh-Cherra Cements Cherrapunji Cement Plant · 66,132 t CO₂e/yr · India
- Annapurna Cement Sunsari-Murang Cement Plant · 64,835 t CO₂e/yr · Nepal
- Erel Darkhan Cement Plant · 63,985 t CO₂e/yr · Mongolia
- Pico Truncado Cement Plant · 69,906 t CO₂e/yr · Argentina
- Gweru Cement Plant · 62,646 t CO₂e/yr · Zimbabwe
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Kulekhani-II Hydroelectric Power Plant Nepal · Hydro · 32 MW · 12 km
- Kulekhani-I Hydroelectric Power Plant Nepal · Hydro · 60 MW · 24 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 182,500 t of cement, Hetauda Cement Hetauda Cement Plant is below the median cement plant in Nepal (292,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 66,314 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 66k t CO₂e/yr (Scope 1), Hetauda Cement Hetauda Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 66k t at the EU CBAM rate (€75/t) is €5.0M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Nepal
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Hetauda Cement Industries Ltd.
Local climate
Hetauda Cement Hetauda Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 27.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1289 W/m² to ambient — roughly 0.99× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #15 largest of 21 cement plants in Nepal by listed capacity (Climate TRACE).
Nearby industrial sites
- Riddhi Siddhi Ratomate Cement Plant · Cement Plant · 399,057 t CO₂
- Kepy Cement Naubise Cement Plant · Cement Plant · 21,391 t CO₂
- United Cement Naubise Cement Plant · Cement Plant · 173,503 t CO₂
- Huaxin Cement Narayani Cement Plant · Cement Plant · 396,126 t CO₂
- Krishna Cement Birgunj Cement Plant · Cement Plant · 13,135 t CO₂
- Bishwokarma Mukundapur Cement Plant · Cement Plant · 54,903 t CO₂
Location
Coordinates 27.40966, 85.0136. View on OpenStreetMap.
Frequently asked questions
What type of facility is Hetauda Cement Hetauda Cement Plant?
Hetauda Cement Hetauda Cement Plant is a cement plant in Nepal. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Hetauda Cement Hetauda Cement Plant?
The open dataset lists 182,500 t of cement of capacity for Hetauda Cement Hetauda Cement Plant.
How much CO₂ does Hetauda Cement Hetauda Cement Plant emit?
The page uses about 66,314 t CO₂e/year from the open dataset It ranks #17 among facilities in Nepal by estimated CO₂.
Where is Hetauda Cement Hetauda Cement Plant located?
Hetauda Cement Hetauda Cement Plant is in Nepal at approximately 27.40966, 85.0136.
Who operates Hetauda Cement Hetauda Cement Plant?
The operator recorded in the open dataset is Hetauda Cement Industries Ltd.
