Home / Africa / Zimbabwe / Cement plants / Gweru Cement Plant

Gweru Cement Plant

Cement Plant in Zimbabwe. Approximate location -19.41811, 30.0498.

Cement PlantZimbabweCO₂ estimate (modelled)

Gweru Cement Plant is a cement plant in Zimbabwe. Its listed capacity is 250,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Sino Zimbabwe Cement Company Pvt Ltd. By capacity it ranks #2 among 2 cement plants in Zimbabwe. It emits about 62,646 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 15k passenger cars. Its CO₂ per unit of capacity is 31% below the national median for this sector.

250,000t of cement
62,646t CO₂e / yr (Climate TRACE)
#3CO₂ rank in Zimbabwe
0.25t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1898181.

Data status

Known source data

FacilityGweru Cement Plant Climate TRACE
CountryZimbabwe Climate TRACE
Coordinates-19.41811, 30.0498 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity250,000 t of cement Climate TRACE
Owner / operatorSino Zimbabwe Cement Company Pvt Ltd Climate TRACE
Modelled CO₂e62,646 t/yr Climate TRACE

Calculated from the dataset

Zimbabwe rank#3 of 3 · top 100.0% calculated
Global cement rank#2068 of 2113 · top 97.9% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

At 250,000 t of cement, Gweru Cement Plant is below the median cement plant in Zimbabwe (830,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 62,646 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

15kcars driven for a year
8.2khomes' annual energy use
1.0 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 63k t CO₂e/yr (Scope 1), Gweru Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 63k t at the EU CBAM rate (€75/t) is €4.7M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈1k t–3k t/yr, worth €94k€236k, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

63k t CO₂e / yrScope 1 emissions
€4.7M/yrCBAM exposure on EU exports
1k t–3k t/yr ≈ €94k€236kDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Zimbabwe

Colleen Bawn Cement Plant: 830,000 t of cement830kColleen Ba…Gweru Cement Plant: 250,000 t of cement250kGweru Ceme…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Sino Zimbabwe Cement Company Pvt Ltd.

Local climate

Gweru Cement Plant sits in a subtropical highland climate zone (Köppen Cwb), at 19.4°S in the southern hemisphere.

~15°Ctypical annual mean
~20°Ctypical warm-season
Subtropical highland: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 2 cement plants in Zimbabwe by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates -19.41811, 30.0498. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 8,000 MWh/year of recoverable heat-loss reduction and about 2,700 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Gweru Cement Plant?

Gweru Cement Plant is a cement plant in Zimbabwe. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Gweru Cement Plant?

The open dataset lists 250,000 t of cement of capacity for Gweru Cement Plant.

How much CO₂ does Gweru Cement Plant emit?

The page uses about 62,646 t CO₂e/year from the open dataset It ranks #3 among facilities in Zimbabwe by estimated CO₂.

Where is Gweru Cement Plant located?

Gweru Cement Plant is in Zimbabwe at approximately -19.41811, 30.0498.

Who operates Gweru Cement Plant?

The operator recorded in the open dataset is Sino Zimbabwe Cement Company Pvt Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.