Godo Steel Himeji Works is a steel plant in Japan. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Godo Steel Ltd. No facility-measured CO₂ figure is available in the open dataset used here.

500kt steel/yr (Global Energy Monitor)
CO₂ not individually reported — Climate TRACE covers this sector only in aggregate

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566937.

Data status

Known source data

FacilityGodo Steel Himeji Works Climate TRACE
CountryJapan Climate TRACE
Coordinates34.78089, 134.67159 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Owner / operatorGodo Steel Ltd Climate TRACE
GEM steel parentunknown Global Energy Monitor
Steel process routeelectric Global Energy Monitor
Steel asset statusoperating Global Energy Monitor
Steel equipmentEAF Global Energy Monitor
Steel capacity500 ktpa Global Energy Monitor

Calculated from the dataset

Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

Carbon & decarbonization context

No facility-measured CO₂ is published for Godo Steel Himeji Works; Climate TRACE provides only a steel plant sector-level estimate, so a precise per-site figure, ranking or carbon cost would be misleading and is not shown. The decarbonization lever is the same regardless: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

CO₂: Climate TRACE sector-level estimate (not facility-measured). Estimate the saving for this site →

Operator

Operated by Godo Steel Ltd. All facilities by this operator →

Local climate

Godo Steel Himeji Works sits in a humid subtropical climate zone (Köppen Cfa), at 34.8°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
41/100environmental-severity index
23.3°Cseasonal temperature swing
95 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1348 W/m² to ambient — roughly 1.04× the loss at a 20 °C reference; removable insulation recovers about 1281 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 34.78089, 134.67159. View on OpenStreetMap.

Heat loss & insulation profile

For a steel plant, the main modular-insulation targets are reheat & annealing furnaces, ladles, hot-blast stoves, steam & gas ducting. Typical hot-surface ranges used for screening: 200–1,200 °C.

Indicative recoverable energy

A first-pass insulation screen suggests about 6,200 MWh/year of recoverable heat-loss reduction and about 2,100 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

Japan: funding & obligation

Funding. Subsidies to cut upfront cost of energy-saving equipment for industry/commercial; some tied to 'specified business operator' status + S/A benchmark class. official source · verified 2026
Status: Annual call-based — confirm current SII program.

Obligation. Factories/operators with large energy use are designated 'specified business operators': must appoint energy managers, report, and file mid-to-long-term efficiency plans. (applies as a rule above the stated threshold — we do not hold this site's metered energy use). official source · verified 2026

Programme terms verified 2026-06-18; confirm the current open phase before applying. Eligibility depends on a site's energy use / headcount, which we do not hold — not a per-facility eligibility determination.

Frequently asked questions

What type of facility is Godo Steel Himeji Works?

Godo Steel Himeji Works is a steel plant in Japan. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

How much CO₂ does Godo Steel Himeji Works emit?

The open dataset used here does not include a facility-level CO₂ value for Godo Steel Himeji Works.

Where is Godo Steel Himeji Works located?

Godo Steel Himeji Works is in Japan at approximately 34.78089, 134.67159.

Who operates Godo Steel Himeji Works?

The operator recorded in the open dataset is Godo Steel Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.