Gerdau Açominas Ouro Branco steel plant — Brazil
Steel Plant in Brazil. Approximate location -20.54436, -43.75257.
Steel PlantBrazilCO₂ estimate (modelled)
Gerdau Açominas Ouro Branco steel plant is a steel plant in Brazil. Its listed capacity is 4,360,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Gerdau Acominas SA. By capacity it ranks #5 among 11 steel plants in Brazil. It emits about 4,705,160 t CO₂e a year from Climate TRACE. That is 3.4% of the CO₂e from the 130 facilities in Brazil that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 16% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566446.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- ArcelorMittal Pecém steel plant · 4,697,227 t CO₂e/yr · Brazil
- Erdemir Eregli steel plant · 4,724,148 t CO₂e/yr · Türkiye
- Nippon Kyushu Works (Yawata Area, Tobata) steel plant · 4,653,899 t CO₂e/yr · Japan
- ArcelorMittal Méditerranée Fos sur Mer steel plant · 4,780,174 t CO₂e/yr · France
- Baosteel Desheng Stainless Steel Co Ltd · 4,781,034 t CO₂e/yr · China
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Açominas power station · Gas · 103 MW · 0 km
- Açominas · Coal · 103 MW · 6 km
- Agostinho Rodrigues · Hydro · 1 MW · 32 km
- Rio de Pedras · Hydro · 9 MW · 37 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 4,360,000 t of steel, Gerdau Açominas Ouro Branco steel plant is well above the median steel plant in Brazil (950,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 4,705,160 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 4.7M t CO₂e/yr (Scope 1), Gerdau Açominas Ouro Branco steel plant carries no domestic carbon price — and as a CBAM-covered product, its 4.7M t at the EU CBAM rate (€75/t) is €355M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest steel plants in Brazil
Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Gerdau Acominas SA.
Local climate
Gerdau Açominas Ouro Branco steel plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 20.5°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1308 W/m² to ambient — roughly 1.01× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #5 largest of 11 steel plants in Brazil by listed capacity (Climate TRACE).
Nearby industrial sites
- Vallourec Jeceaba steel plant · Steel Plant · 525,338 t CO₂
- Carandaí Cement Plant · Cement Plant · 1,325,374 t CO₂
- Petrobras REGAP Refinery · Refinery · 1,064,328 t CO₂
- Barroso Cement Plant · Cement Plant · 1,052,724 t CO₂
- Lagoa Santa Cement Plant · Cement Plant · 1,679,156 t CO₂
- ArcelorMittal Monlevade steel plant · Steel Plant · 1,835,723 t CO₂
Location
Coordinates -20.54436, -43.75257. View on OpenStreetMap.
Frequently asked questions
What type of facility is Gerdau Açominas Ouro Branco steel plant?
Gerdau Açominas Ouro Branco steel plant is a steel plant in Brazil. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for Gerdau Açominas Ouro Branco steel plant?
The open dataset lists 4,360,000 t of steel of capacity for Gerdau Açominas Ouro Branco steel plant.
How much CO₂ does Gerdau Açominas Ouro Branco steel plant emit?
The page uses about 4,705,160 t CO₂e/year from the open dataset It ranks #8 among facilities in Brazil by estimated CO₂.
Where is Gerdau Açominas Ouro Branco steel plant located?
Gerdau Açominas Ouro Branco steel plant is in Brazil at approximately -20.54436, -43.75257.
Who operates Gerdau Açominas Ouro Branco steel plant?