Cibra-Pataias Cement Plant — Portugal
Cement Plant in Portugal. Approximate location 39.65615, -8.98764.
Cement PlantPortugalCO₂ estimate (modelled)
Cibra-Pataias Cement Plant is a cement plant in Portugal. Its listed capacity is 980,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by SECIL - Companhia Geral de Cal e Cimento SA. By capacity it ranks #4 among 5 cement plants in Portugal. It emits about 326,594 t CO₂e a year from Climate TRACE. That is 2.2% of the CO₂e from the 29 facilities in Portugal that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 8% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897687.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Purbachal Cement Sarutari Cement Plant · 326,803 t CO₂e/yr · India
- Villa Gautier Cement Plant · 326,209 t CO₂e/yr · Dominican Republic
- Zambezi Ndola Cement Plant · 327,481 t CO₂e/yr · Zambia
- Valea Mare Pravat Cement Plant · 325,341 t CO₂e/yr · Romania
- Truong Son Cement Lương Sơn Cement Plant · 325,151 t CO₂e/yr · Vietnam
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Senhora da Vitória · Wind · 12 MW · 8 km
- Leiria (Central de Valorização Orgânica) · Waste · 2 MW · 12 km
- Cela · Wind · 2 MW · 14 km
- Portela do Pereiro · Wind · 8 MW · 19 km
- Chão Falcão · Wind · 90 MW · 21 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 980,000 t of cement, Cibra-Pataias Cement Plant is below the median cement plant in Portugal (1,450,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 326,594 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 327k t CO₂e/yr (Scope 1), Cibra-Pataias Cement Plant carries €27.9M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Portugal
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by SECIL - Companhia Geral de Cal e Cimento SA. All facilities by this operator →
Local climate
Cibra-Pataias Cement Plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1354 W/m² to ambient — roughly 1.04× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #4 largest of 5 cement plants in Portugal by listed capacity (Climate TRACE).
Nearby industrial sites
- Fábrica Cibra-Pataias (Ci) · Lime Plant · 462,286 t CO₂
- Maceirla-Liz Cement Plant · Cement Plant · 508,322 t CO₂
- Fábrica Maceira-Liz (Ci) · Lime Plant · 772,821 t CO₂
- Promor-Abastecedora De Produtos Agro-Pecuários, S.A. (Ci) · Food & Beverage · 280,824 t CO₂
- Calcidrata - Indústrias De Cal, S. A. (Ci) · Lime Plant · 264,680 t CO₂
- Lusical, Companhia Lusitana De Cal Sa (Ci) · Lime Plant · 354,754 t CO₂
Location
Coordinates 39.65615, -8.98764. View on OpenStreetMap.
Frequently asked questions
What type of facility is Cibra-Pataias Cement Plant?
Cibra-Pataias Cement Plant is a cement plant in Portugal. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Cibra-Pataias Cement Plant?
The open dataset lists 980,000 t of cement of capacity for Cibra-Pataias Cement Plant.
How much CO₂ does Cibra-Pataias Cement Plant emit?
The page uses about 326,594 t CO₂e/year from the open dataset It ranks #15 among facilities in Portugal by estimated CO₂.
Where is Cibra-Pataias Cement Plant located?
Cibra-Pataias Cement Plant is in Portugal at approximately 39.65615, -8.98764.
Who operates Cibra-Pataias Cement Plant?
The operator recorded in the open dataset is SECIL - Companhia Geral de Cal e Cimento SA.
