CAP Acero Huachipato steel plant is a steel plant in Chile. Its listed capacity is 1,085,519 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Compania Siderurgica Huachipato SA. By capacity it ranks #1 among 2 steel plants in Chile. It emits about 947,868 t CO₂e a year from Climate TRACE. That is 12% of the CO₂e from the 20 facilities in Chile that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 6% below the national median for this sector.

1,085,519t of steel
947,868t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Chile
0.87t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566477.

Data status

Known source data

FacilityCAP Acero Huachipato steel plant Climate TRACE
CountryChile Climate TRACE
Coordinates-36.7477, -73.12749 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Reported capacity1,085,519 t of steel Climate TRACE
Owner / operatorCompania Siderurgica Huachipato SA Climate TRACE
GEM steel parentCAP SA [100.0%] Global Energy Monitor
Steel process routeintegrated BF Global Energy Monitor
Steel asset statusoperating Global Energy Monitor
Steel equipmentBF, BOF Global Energy Monitor
Steel capacity1,450 ktpa Global Energy Monitor
Modelled CO₂e947,868 t/yr Climate TRACE

Calculated from the dataset

Chile rank#4 of 20 · top 20.0% calculated
Global iron-and-steel rank#393 of 868 · top 45.3% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 1,085,519 t of steel, CAP Acero Huachipato steel plant is around the median steel plant in Chile (1,085,519 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 947,868 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

5.3krailcars of coal burned
221kgasoline cars driven for a year
948kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 948k t CO₂e/yr (Scope 1), CAP Acero Huachipato steel plant carries no domestic carbon price — and as a CBAM-covered product, its 948k t at the EU CBAM rate (€75/t) is €71.4M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

948k t CO₂e / yrScope 1 emissions
€71.4M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest steel plants in Chile

CAP Acero Huachipato steel plant: 1,085,519 t of steel1.1MCAP Acero …AZA Colina steel plant: 520,000 t of steel520kAZA Colina…

Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Compania Siderurgica Huachipato SA.

Local climate

CAP Acero Huachipato steel plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 36.7°S in the southern hemisphere.

~14°Ctypical annual mean
~21°Ctypical warm-season
Warm-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
37/100environmental-severity index
8.0°Cseasonal temperature swing
10 kmdistance to coast
Very highCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1375 W/m² to ambient — roughly 1.06× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #1 largest of 2 steel plants in Chile by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates -36.7477, -73.12749. View on OpenStreetMap.

Frequently asked questions

What type of facility is CAP Acero Huachipato steel plant?

CAP Acero Huachipato steel plant is a steel plant in Chile. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

What capacity is listed for CAP Acero Huachipato steel plant?

The open dataset lists 1,085,519 t of steel of capacity for CAP Acero Huachipato steel plant.

How much CO₂ does CAP Acero Huachipato steel plant emit?

The page uses about 947,868 t CO₂e/year from the open dataset It ranks #4 among facilities in Chile by estimated CO₂.

Where is CAP Acero Huachipato steel plant located?

CAP Acero Huachipato steel plant is in Chile at approximately -36.7477, -73.12749.

Who operates CAP Acero Huachipato steel plant?

The operator recorded in the open dataset is Compania Siderurgica Huachipato SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.