Benteler Steel Tube Lingen plant is a steel plant in Germany. Its listed capacity is 650,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Benteler Steel/Tube GmbH. By capacity it ranks #10 among 11 steel plants in Germany. It emits about 38,878 t CO₂e a year from Climate TRACE. That is 0.03% of the CO₂e from the 118 facilities in Germany that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 94% below the national median for this sector.

650,000t of steel
38,878t CO₂e / yr (Climate TRACE)
#115CO₂ rank in Germany
0.06t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566785.

Data status

Known source data

FacilityBenteler Steel Tube Lingen plant Climate TRACE
CountryGermany Climate TRACE
Coordinates52.46763, 7.3177 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Reported capacity650,000 t of steel Climate TRACE
Owner / operatorBenteler Steel/Tube GmbH Climate TRACE
GEM steel parentBenteler International AG [100.0%] Global Energy Monitor
Steel process routeelectric Global Energy Monitor
Steel asset statusoperating Global Energy Monitor
Steel equipmentEAF Global Energy Monitor
Steel capacity650 ktpa Global Energy Monitor
Modelled CO₂e38,878 t/yr Climate TRACE

Calculated from the dataset

Germany rank#115 of 118 · top 97.5% calculated
Global iron-and-steel rank#806 of 868 · top 92.9% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 650,000 t of steel, Benteler Steel Tube Lingen plant is below the median steel plant in Germany (2,760,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 38,878 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

216railcars of coal burned
8.1khomes' electricity use for a year
648ktree seedlings grown for 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 39k t CO₂e/yr (Scope 1), Benteler Steel Tube Lingen plant carries €3.3M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.

39k t CO₂e / yrScope 1 emissions
€3.3M/yrcarbon value · full EU ETS price

Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest steel plants in Germany

ThyssenKrupp Steel Duisburg steel plant: 11,000,000 t of steel11.0MThyssenKru…Hüttenwerke Krupp Mannesmann (HKM) steel plant: 6,300,000 t of steel6.3MHüttenwerk…Salzgitter Flachstahl steel plant: 5,200,000 t of steel5.2MSalzgitter…ArcelorMittal Bremen steel plant: 3,800,000 t of steel3.8MArcelorMit…Saarstahl Völklingen Steelmaking Plant: 3,240,000 t of steel3.2MSaarstahl …AG der Dillinger Hüttenwerke Dillingen steel plant: 2,760,000 t of steel2.8MAG der Dil…Kehler Baden Steel Works: 2,500,000 t of steel2.5MKehler Bad…ArcelorMittal Eisenhüttenstadt steel plant: 2,400,000 t of steel2.4MArcelorMit…

Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Benteler Steel/Tube GmbH.

Local climate

Benteler Steel Tube Lingen plant sits in a temperate oceanic climate zone (Köppen Cfb), at 52.5°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
28/100environmental-severity index
15.5°Cseasonal temperature swing
85 kmdistance to coast
ModerateCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1405 W/m² to ambient — roughly 1.08× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #10 largest of 11 steel plants in Germany by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 52.46763, 7.3177. View on OpenStreetMap.

Frequently asked questions

What type of facility is Benteler Steel Tube Lingen plant?

Benteler Steel Tube Lingen plant is a steel plant in Germany. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

What capacity is listed for Benteler Steel Tube Lingen plant?

The open dataset lists 650,000 t of steel of capacity for Benteler Steel Tube Lingen plant.

How much CO₂ does Benteler Steel Tube Lingen plant emit?

The page uses about 38,878 t CO₂e/year from the open dataset It ranks #115 among facilities in Germany by estimated CO₂.

Where is Benteler Steel Tube Lingen plant located?

Benteler Steel Tube Lingen plant is in Germany at approximately 52.46763, 7.3177.

Who operates Benteler Steel Tube Lingen plant?

The operator recorded in the open dataset is Benteler Steel/Tube GmbH.

Built from open public data; no personal information. Operate this site? Request a correction or removal.