Home / Asia / Turkmenistan / Cement plants / Baherden Cement Plant

Baherden Cement Plant — Turkmenistan

Cement Plant in Turkmenistan. Approximate location 38.26087, 57.65795.

Cement PlantTurkmenistanCO₂ estimate (modelled)

Baherden Cement Plant is a cement plant in Turkmenistan. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Ministry of Industry and Construction Production (Turkmenistan). It emits about 1,174,947 t CO₂e a year from Climate TRACE. That is 24% of the CO₂e from the 9 facilities in Turkmenistan that have an emissions figure in IndustryAtlas.

1,174,947t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Turkmenistan

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897837.

Data status

Known source data

FacilityBaherden Cement Plant Climate TRACE
CountryTurkmenistan Climate TRACE
Coordinates38.26087, 57.65795 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorMinistry of Industry and Construction Production (Turkmenistan) Climate TRACE
Modelled CO₂e1,174,947 t/yr Climate TRACE

Calculated from the dataset

Turkmenistan rank#2 of 9 · top 22.2% calculated
Global cement rank#339 of 2113 · top 16.0% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 1,174,947 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

6.5krailcars of coal burned
274kgasoline cars driven for a year
351wind turbines running for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 1.2M t CO₂e/yr (Scope 1), Baherden Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.2M t at the EU CBAM rate (€75/t) is €88.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

1.2M t CO₂e / yrScope 1 emissions
€88.5M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Local climate

Baherden Cement Plant sits in a cold desert climate zone (Köppen BWk), at 38.3°N in the northern hemisphere.

~11°Ctypical annual mean
~26°Ctypical warm-season
Cold desert: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.

C1ISO 9223 corrosivity (indicative)
43/100environmental-severity index
27.7°Cseasonal temperature swing
297 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1342 W/m² to ambient — roughly 1.03× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 38.26087, 57.65795. View on OpenStreetMap.

Frequently asked questions

What type of facility is Baherden Cement Plant?

Baherden Cement Plant is a cement plant in Turkmenistan. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does Baherden Cement Plant emit?

The page uses about 1,174,947 t CO₂e/year from the open dataset It ranks #2 among facilities in Turkmenistan by estimated CO₂.

Where is Baherden Cement Plant located?

Baherden Cement Plant is in Turkmenistan at approximately 38.26087, 57.65795.

Who operates Baherden Cement Plant?

The operator recorded in the open dataset is Ministry of Industry and Construction Production (Turkmenistan).

Built from open public data; no personal information. Operate this site? Request a correction or removal.