Alicante Cement Plant — Spain
Cement Plant in Spain. Approximate location 38.37736, -0.54323.
Cement PlantSpainCO₂ estimate (modelled)
Alicante Cement Plant is a cement plant in Spain. Its listed capacity is 1,361,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Çimsa España Operaciones SLU. By capacity it ranks #9 among 20 cement plants in Spain. It emits about 344,009 t CO₂e a year from Climate TRACE. That is 0.72% of the CO₂e from the 91 facilities in Spain that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 30% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438400.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Thang Long Cement Hoành Bồ Cement Plant · 344,085 t CO₂e/yr · Vietnam
- Karlstadt Cement Plant · 344,708 t CO₂e/yr · Germany
- Los Patios Cement Plant · 344,788 t CO₂e/yr · Colombia
- Titan Cement Beni Suef Plant · 342,909 t CO₂e/yr · Egypt
- Ribnita Cement Plant · 342,766 t CO₂e/yr · Moldova
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Actiu Technological Park · Solar · 5 MW · 27 km
- El Realengo · Solar · 13 MW · 30 km
- PARQUE EOLICO DE LA SOLANA · Wind · 24 MW · 37 km
- PARQUE EOLICO LA SOLANA · Wind · 44 MW · 37 km
- PARQUE EOLICO SOLANA · Wind · 30 MW · 37 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 1,361,000 t of cement, Alicante Cement Plant is around the median cement plant in Spain (1,250,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 344,009 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 344k t CO₂e/yr (Scope 1), Alicante Cement Plant carries €29.4M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Spain
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Çimsa España Operaciones SLU. All facilities by this operator →
Local climate
Alicante Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 38.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with dust abrasion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1366 W/m² to ambient — roughly 1.05× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #9 largest of 20 cement plants in Spain by listed capacity (Climate TRACE).
Nearby industrial sites
- Alcurnia Alimentación, S. L. U. - Fábrica De Alguazas · Food & Beverage · 67,672 t CO₂
- Nanta, S.A.U. Las Palas · Food & Beverage · 1,761,933 t CO₂
- Repsol Cartagena Refinery · Refinery · 2,566,756 t CO₂
- El Pozo Alimentación · Food & Beverage · 52,958 t CO₂
- Bunge Ibérica, S.A.U. · Food & Beverage
- Roquette Laisa España · Food & Beverage · 108,933 t CO₂
Location
Coordinates 38.37736, -0.54323. View on OpenStreetMap.
Frequently asked questions
What type of facility is Alicante Cement Plant?
Alicante Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Alicante Cement Plant?
The open dataset lists 1,361,000 t of cement of capacity for Alicante Cement Plant.
How much CO₂ does Alicante Cement Plant emit?
The page uses about 344,009 t CO₂e/year from the open dataset It ranks #35 among facilities in Spain by estimated CO₂.
Where is Alicante Cement Plant located?
Alicante Cement Plant is in Spain at approximately 38.37736, -0.54323.
Who operates Alicante Cement Plant?
The operator recorded in the open dataset is Çimsa España Operaciones SLU.
