Home / Europe / Ukraine / Steel plants / Alchevsk Metallurgical Plant

Alchevsk Metallurgical Plant — Ukraine

Steel Plant in Ukraine. Approximate location 48.47134, 38.77075.

Steel PlantUkraineCO₂ estimate (modelled)Status: retired (GEM)

Alchevsk Metallurgical Plant is a steel plant in Ukraine. Its listed capacity is 2,736,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Alchevsk Metallurgical Plant PJSC. By capacity it ranks #6 among 8 steel plants in Ukraine. It emits about 1,856,802 t CO₂e a year from Climate TRACE. That is 7.4% of the CO₂e from the 25 facilities in Ukraine that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 27% below the national median for this sector.

2,736,000t of steel
retiredasset status (Global Energy Monitor)
1,856,802t CO₂e / yr (Climate TRACE)
#6CO₂ rank in Ukraine
0.68t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567095.

Data status

Known source data

FacilityAlchevsk Metallurgical Plant Climate TRACE
CountryUkraine Climate TRACE
Coordinates48.47134, 38.77075 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Reported capacity2,736,000 t of steel Climate TRACE
Owner / operatorAlchevsk Metallurgical Plant PJSC Climate TRACE
GEM steel parentISD Corp Global Energy Monitor
Steel process routeintegrated BF Global Energy Monitor
Steel asset statusretired Global Energy Monitor
Steel equipmentBF Global Energy Monitor
Modelled CO₂e1,856,802 t/yr Climate TRACE

Calculated from the dataset

Ukraine rank#6 of 25 · top 24.0% calculated
Global iron-and-steel rank#326 of 868 · top 37.6% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 2,736,000 t of steel, Alchevsk Metallurgical Plant is below the median steel plant in Ukraine (3,500,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 1,856,802 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

10krailcars of coal burned
433kgasoline cars driven for a year
555wind turbines running for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 1.9M t CO₂e/yr (Scope 1), Alchevsk Metallurgical Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.9M t at the EU CBAM rate (€75/t) is €140M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

1.9M t CO₂e / yrScope 1 emissions
€140M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest steel plants in Ukraine

ArcelorMittal Kryvyi Rih steel plant: 6,498,000 t of steel6.5MArcelorMit…Metinvest Ilyich Iron and Steel Works: 4,299,000 t of steel4.3MMetinvest …Metinvest Zaporizhstal steel plant: 4,102,000 t of steel4.1MMetinvest …Metallurgical Plant Kametstal: 3,500,000 t of steel3.5MMetallurgi…Yenakiieve Metallurgical Plant: 3,300,000 t of steel3.3MYenakiieve…Alchevsk Metallurgical Plant: 2,736,000 t of steel2.7MAlchevsk M…Interpipe Steel Plant: 1,320,000 t of steel1.3MInterpipe …DCH Dnipro Metallurgical Plant: 1,230,000 t of steel1.2MDCH Dnipro…

Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Alchevsk Metallurgical Plant PJSC.

Local climate

Alchevsk Metallurgical Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 48.5°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with thermal cycling the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
30/100environmental-severity index
27.0°Cseasonal temperature swing
222 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1421 W/m² to ambient — roughly 1.09× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #6 largest of 8 steel plants in Ukraine by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 48.47134, 38.77075. View on OpenStreetMap.

Frequently asked questions

What type of facility is Alchevsk Metallurgical Plant?

Alchevsk Metallurgical Plant is a steel plant in Ukraine. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

What capacity is listed for Alchevsk Metallurgical Plant?

The open dataset lists 2,736,000 t of steel of capacity for Alchevsk Metallurgical Plant.

How much CO₂ does Alchevsk Metallurgical Plant emit?

The page uses about 1,856,802 t CO₂e/year from the open dataset It ranks #6 among facilities in Ukraine by estimated CO₂.

Where is Alchevsk Metallurgical Plant located?

Alchevsk Metallurgical Plant is in Ukraine at approximately 48.47134, 38.77075.

Who operates Alchevsk Metallurgical Plant?

The operator recorded in the open dataset is Alchevsk Metallurgical Plant PJSC.