AHCC Zliten Cement Plant is a cement plant in Libya. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Al Ahlia Cement Co. It emits about 853,771 t CO₂e a year from Climate TRACE. That is 19% of the CO₂e from the 11 facilities in Libya that have an emissions figure in IndustryAtlas.

853,771t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Libya

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897440.

Data status

Known source data

FacilityAHCC Zliten Cement Plant Climate TRACE
CountryLibya Climate TRACE
Coordinates32.4235, 14.4856 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorAl Ahlia Cement Co Climate TRACE
Modelled CO₂e853,771 t/yr Climate TRACE

Calculated from the dataset

Libya rank#2 of 11 · top 18.2% calculated
Global cement rank#578 of 2113 · top 27.4% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 853,771 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

4.7krailcars of coal burned
199kgasoline cars driven for a year
854kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 854k t CO₂e/yr (Scope 1), AHCC Zliten Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 854k t at the EU CBAM rate (€75/t) is €64.3M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

854k t CO₂e / yrScope 1 emissions
€64.3M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Local climate

AHCC Zliten Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 32.4°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
57/100environmental-severity index
14.3°Cseasonal temperature swing
31 kmdistance to coast
Very highCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1294 W/m² to ambient — roughly 0.99× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 32.4235, 14.4856. View on OpenStreetMap.

Frequently asked questions

What type of facility is AHCC Zliten Cement Plant?

AHCC Zliten Cement Plant is a cement plant in Libya. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does AHCC Zliten Cement Plant emit?

The page uses about 853,771 t CO₂e/year from the open dataset It ranks #2 among facilities in Libya by estimated CO₂.

Where is AHCC Zliten Cement Plant located?

AHCC Zliten Cement Plant is in Libya at approximately 32.4235, 14.4856.

Who operates AHCC Zliten Cement Plant?

The operator recorded in the open dataset is Al Ahlia Cement Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.