Home / Europe / Germany / Steel plants / AG der Dillinger Hüttenwerke Dillingen steel plant

AG der Dillinger Hüttenwerke Dillingen steel plant — Germany

Steel Plant in Germany. Approximate location 49.35302, 6.74529.

Steel PlantGermanyCO₂ estimate (modelled)Status: operating pre-retirement (GEM)

AG der Dillinger Hüttenwerke Dillingen steel plant is a steel plant in Germany. Its listed capacity is 2,760,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by AG der Dillinger Hüttenwerke AG. By capacity it ranks #6 among 11 steel plants in Germany. It emits about 3,852,719 t CO₂e a year from Climate TRACE. That is 3.4% of the CO₂e from the 118 facilities in Germany that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 50% above the national median for this sector.

2,760,000t of steel
operating pre-retirementasset status (Global Energy Monitor)
3,852,719t CO₂e / yr (Climate TRACE)
#7CO₂ rank in Germany
1.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566773.

Data status

Known source data

FacilityAG der Dillinger Hüttenwerke Dillingen steel plant Climate TRACE
CountryGermany Climate TRACE
Coordinates49.35302, 6.74529 Climate TRACE
Sector / subsectoriron-and-steel Climate TRACE
Reported capacity2,760,000 t of steel Climate TRACE
Owner / operatorAG der Dillinger Hüttenwerke AG Climate TRACE
GEM steel parentSHS Stahl Holding Saar GmbH & Co KgaA [32.2%]; ArcelorMittal SA [28.7%]; SHS - Stahl-Holding-Saar GmbH & Co KGaA [24.9%] Global Energy Monitor
Steel process routeironmaking BF Global Energy Monitor
Steel asset statusoperating pre-retirement Global Energy Monitor
Steel equipmentBF Global Energy Monitor
Modelled CO₂e3,852,719 t/yr Climate TRACE

Calculated from the dataset

Germany rank#7 of 118 · top 5.9% calculated
Global iron-and-steel rank#206 of 868 · top 23.7% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 2,760,000 t of steel, AG der Dillinger Hüttenwerke Dillingen steel plant is around the median steel plant in Germany (2,760,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 3,852,719 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

21krailcars of coal burned
898kgasoline cars driven for a year
1.2kwind turbines running for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 3.9M t CO₂e/yr (Scope 1), AG der Dillinger Hüttenwerke Dillingen steel plant carries €329M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.

3.9M t CO₂e / yrScope 1 emissions
€329M/yrcarbon value · full EU ETS price

Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest steel plants in Germany

ThyssenKrupp Steel Duisburg steel plant: 11,000,000 t of steel11.0MThyssenKru…Hüttenwerke Krupp Mannesmann (HKM) steel plant: 6,300,000 t of steel6.3MHüttenwerk…Salzgitter Flachstahl steel plant: 5,200,000 t of steel5.2MSalzgitter…ArcelorMittal Bremen steel plant: 3,800,000 t of steel3.8MArcelorMit…Saarstahl Völklingen Steelmaking Plant: 3,240,000 t of steel3.2MSaarstahl …AG der Dillinger Hüttenwerke Dillingen steel plant: 2,760,000 t of steel2.8MAG der Dil…Kehler Baden Steel Works: 2,500,000 t of steel2.5MKehler Bad…ArcelorMittal Eisenhüttenstadt steel plant: 2,400,000 t of steel2.4MArcelorMit…

Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by AG der Dillinger Hüttenwerke AG.

Local climate

AG der Dillinger Hüttenwerke Dillingen steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 49.4°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
25/100environmental-severity index
17.1°Cseasonal temperature swing
325 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1405 W/m² to ambient — roughly 1.08× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #6 largest of 11 steel plants in Germany by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 49.35302, 6.74529. View on OpenStreetMap.

Frequently asked questions

What type of facility is AG der Dillinger Hüttenwerke Dillingen steel plant?

AG der Dillinger Hüttenwerke Dillingen steel plant is a steel plant in Germany. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.

What capacity is listed for AG der Dillinger Hüttenwerke Dillingen steel plant?

The open dataset lists 2,760,000 t of steel of capacity for AG der Dillinger Hüttenwerke Dillingen steel plant.

How much CO₂ does AG der Dillinger Hüttenwerke Dillingen steel plant emit?

The page uses about 3,852,719 t CO₂e/year from the open dataset It ranks #7 among facilities in Germany by estimated CO₂.

Where is AG der Dillinger Hüttenwerke Dillingen steel plant located?

AG der Dillinger Hüttenwerke Dillingen steel plant is in Germany at approximately 49.35302, 6.74529.

Who operates AG der Dillinger Hüttenwerke Dillingen steel plant?

The operator recorded in the open dataset is AG der Dillinger Hüttenwerke AG.

Built from open public data; no personal information. Operate this site? Request a correction or removal.