Cement Plant in Tanzania. Approximate location -5.10796, 38.99662.
Cement PlantTanzaniaCO₂ reported
Tanzania Portland Tanga Cement Plant is a cement plant in Tanzania with a reported capacity of 1,300,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Tanzania Portland Cement PLC. By capacity it ranks #2 of 6 cement plants tracked in Tanzania. It emits about 645,540 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 150,476 cars. Its CO₂ per unit of capacity is about 38% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897930.
Przy 1,300,000 t of cement, Tanzania Portland Tanga Cement Plant jest około medianę cement plant w Tanzania (1,100,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 5% powyżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.
Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Tanzania Portland Cement PLC. All facilities by this operator →
Tanzania Portland Tanga Cement Plant sits in a tropical monsoon climate zone (Köppen Am), at 5.1°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 6 cement plants in Tanzania by reported capacity.
Coordinates -5.10796, 38.99662. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Tanzania Portland Tanga Cement Plant is a cement plant in Tanzania. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Tanzania Portland Tanga Cement Plant has a reported capacity of 1,300,000 t of cement.
Tanzania Portland Tanga Cement Plant emits about 645,540 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 150,476 cars. That ranks #2 among tracked facilities in Tanzania.
Tanzania Portland Tanga Cement Plant is in Tanzania, near coordinates -5.10796, 38.99662.
Tanzania Portland Tanga Cement Plant is operated by Tanzania Portland Cement PLC.