Home / Africa / Tanzania / Cement plants / Huaxin Tanga Cement Plant

Huaxin Tanga Cement Plant

Cement Plant in Tanzania. Approximate location -5.10125, 39.02174.

Cement PlantTanzaniaCO₂ reported

Huaxin Tanga Cement Plant is a cement plant in Tanzania with a reported capacity of 800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Huaxin Cement Co Ltd. By capacity it ranks #4 of 6 cement plants tracked in Tanzania. It emits about 280,264 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 65,330 cars.

800,000t of cement
280,264t CO₂e / yr (Climate TRACE)
#6CO₂ rank in Tanzania
0.35t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897924.

W kontekście: jak ta instalacja się porównuje

Przy 800,000 t of cement, Huaxin Tanga Cement Plant jest poniżej medianę cement plant w Tanzania (1,100,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 26% poniżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 280,264 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

65,330cars driven for a year
36,550homes' annual energy use
4,671,067tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Tanzania

Mtwara Cement Plant: 3,000,000 t of cement3.0MMtwara Cem…Tanzania Portland Tanga Cement Plant: 1,300,000 t of cement1.3MTanzania P…Songwe Cement Plant: 1,100,000 t of cement1.1MSongwe Cem…Huaxin Tanga Cement Plant: 800,000 t of cement800kHuaxin Tan…Tanzania Portland Dar Es Salaam Cement Plant: 700,000 t of cement700kTanzania P…Lake Cement Plant: 600,000 t of cement600kLake Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Huaxin Cement Co Ltd. All facilities by this operator →

Local climate

Huaxin Tanga Cement Plant sits in a tropical savanna climate zone (Köppen As), at 5.1°S in the southern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 6 cement plants in Tanzania by reported capacity.

Nearby industrial sites

Location

Coordinates -5.10125, 39.02174. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Huaxin Tanga Cement Plant?

Huaxin Tanga Cement Plant is a cement plant in Tanzania. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Huaxin Tanga Cement Plant?

Huaxin Tanga Cement Plant has a reported capacity of 800,000 t of cement.

How much CO₂ does Huaxin Tanga Cement Plant emit?

Huaxin Tanga Cement Plant emits about 280,264 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 65,330 cars. That ranks #6 among tracked facilities in Tanzania.

Where is Huaxin Tanga Cement Plant located?

Huaxin Tanga Cement Plant is in Tanzania, near coordinates -5.10125, 39.02174.

Who operates Huaxin Tanga Cement Plant?

Huaxin Tanga Cement Plant is operated by Huaxin Cement Co Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.