Steel Plant in Switzerland. Approximate location 47.17283, 7.56332.
Steel PlantSwitzerlandCO₂ reported
Stahl Gerlafingen steel plant is a steel plant in Switzerland with a reported capacity of 720,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Stahl Gerlafingen AG. By capacity it ranks #1 of 2 steel plants tracked in Switzerland. It emits about 50,453 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 11,761 cars. Its CO₂ per unit of capacity is about 87% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566476.
Con 720,000 t of steel, Stahl Gerlafingen steel plant è attorno a la mediana di steel plant in Switzerland (720,000 t of steel). Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Stahl Gerlafingen AG. All facilities by this operator →
Stahl Gerlafingen steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 47.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 2 steel plants in Switzerland by reported capacity.
Coordinates 47.17283, 7.56332. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Stahl Gerlafingen steel plant is a steel plant in Switzerland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Stahl Gerlafingen steel plant has a reported capacity of 720,000 t of steel.
Stahl Gerlafingen steel plant emits about 50,453 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 11,761 cars. That ranks #14 among tracked facilities in Switzerland.
Stahl Gerlafingen steel plant is in Switzerland, near coordinates 47.17283, 7.56332.
Stahl Gerlafingen steel plant is operated by Stahl Gerlafingen AG.