Home / Europe / Switzerland / Cement plants / Pery La Heutte Cement Plant

Pery La Heutte Cement Plant

Cement Plant in Switzerland. Approximate location 47.18297, 7.24806.

Cement PlantSwitzerlandCO₂ reported

Pery La Heutte Cement Plant is a cement plant in Switzerland with a reported capacity of 900,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Schweiz) AG. By capacity it ranks #2 of 6 cement plants tracked in Switzerland. It emits about 215,365 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 50,202 cars. Its CO₂ per unit of capacity is about 34% below the median cement plant.

900,000t of cement
215,365t CO₂e / yr (Climate TRACE)
#5CO₂ rank in Switzerland
0.24t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42545420.

Nel contesto: come si confronta questo impianto

Con 900,000 t of cement, Pery La Heutte Cement Plant è attorno a la mediana di cement plant in Switzerland (800,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 23% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 215,365 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

50,202cars driven for a year
28,086homes' annual energy use
3,589,417tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Switzerland

Wurenlingen Cement Plant: 900,000 t of cement900kWurenlinge…Pery La Heutte Cement Plant: 900,000 t of cement900kPery La He…Untervaz Cement Plant: 800,000 t of cement800kUntervaz C…Moriken Wildegg Cement Plant: 800,000 t of cement800kMoriken Wi…Eclepens Cement Plant: 700,000 t of cement700kEclepens C…Cornaux Cement Plant: 300,000 t of cement300kCornaux Ce…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Holcim (Schweiz) AG. All facilities by this operator →

Local climate

Pery La Heutte Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 47.2°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 6 cement plants in Switzerland by reported capacity.

Nearby industrial sites

Location

Coordinates 47.18297, 7.24806. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Pery La Heutte Cement Plant?

Pery La Heutte Cement Plant is a cement plant in Switzerland. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Pery La Heutte Cement Plant?

Pery La Heutte Cement Plant has a reported capacity of 900,000 t of cement.

How much CO₂ does Pery La Heutte Cement Plant emit?

Pery La Heutte Cement Plant emits about 215,365 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 50,202 cars. That ranks #5 among tracked facilities in Switzerland.

Where is Pery La Heutte Cement Plant located?

Pery La Heutte Cement Plant is in Switzerland, near coordinates 47.18297, 7.24806.

Who operates Pery La Heutte Cement Plant?

Pery La Heutte Cement Plant is operated by Holcim (Schweiz) AG.

Built from open public data; no personal information. Operate this site? Request a correction or removal.