Cement Plant in Nepal. Approximate location 27.6801, 84.29182.
Cement PlantNepalCO₂ reported
Bishwokarma Mukundapur Cement Plant is a cement plant in Nepal with a reported capacity of 138,600 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Bishwokarma Cement Pvt Ltd. By capacity it ranks #20 of 24 cement plants tracked in Nepal. It emits about 54,903 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 12,798 cars. Its CO₂ per unit of capacity is about 10% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547272.
Con 138,600 t of cement, Bishwokarma Mukundapur Cement Plant è al di sotto di la mediana di cement plant in Nepal (730,000 t of cement). Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Bishwokarma Cement Pvt Ltd. All facilities by this operator →
Bishwokarma Mukundapur Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 27.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #20 largest of 24 cement plants in Nepal by reported capacity.
Coordinates 27.6801, 84.29182. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Bishwokarma Mukundapur Cement Plant is a cement plant in Nepal. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Bishwokarma Mukundapur Cement Plant has a reported capacity of 138,600 t of cement.
Bishwokarma Mukundapur Cement Plant emits about 54,903 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 12,798 cars. That ranks #20 among tracked facilities in Nepal.
Bishwokarma Mukundapur Cement Plant is in Nepal, near coordinates 27.6801, 84.29182.
Bishwokarma Mukundapur Cement Plant is operated by Bishwokarma Cement Pvt Ltd.