Cement Plant in Spain. Approximate location 39.66399, -0.24756.
Cement PlantSpainCO₂ reported
Villaluenga de la Sagra Cement Plant is a cement plant in Spain with a reported capacity of 2,350,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim España SAU. By capacity it ranks #3 of 29 cement plants tracked in Spain. It emits about 933,829 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 217,676 cars. Its CO₂ per unit of capacity is about 10% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438413.
À 2,350,000 t of cement, Villaluenga de la Sagra Cement Plant est bien au-dessus de la médiane des cement plant en Spain (1,361,000 t of cement). Son CO₂ par unité de capacité est approximativement 38% au-dessus de la médiane des cement plant. Sous-secteur: cement. Comme cement plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1400°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les cimenteries chauffent le calcaire à 1.400°C dans des fours rotatifs — l'un des processus industriels les plus chauds — et doivent contrôler la température avec précision sur toute la longueur du four.
Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim España SAU. All facilities by this operator →
Villaluenga de la Sagra Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 29 cement plants in Spain by reported capacity.
Coordinates 39.66399, -0.24756. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Villaluenga de la Sagra Cement Plant is a cement plant in Spain. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Villaluenga de la Sagra Cement Plant has a reported capacity of 2,350,000 t of cement.
Villaluenga de la Sagra Cement Plant emits about 933,829 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 217,676 cars. That ranks #15 among tracked facilities in Spain.
Villaluenga de la Sagra Cement Plant is in Spain, near coordinates 39.66399, -0.24756.
Villaluenga de la Sagra Cement Plant is operated by Holcim España SAU.